ProposalWorkspaceFederal OpportunitiesDepartment of Energy

Fire Alarm Control Panel Replacement Project (FACPR)

Active 2026-PTG-FACPR SolicitationDepartment of Energy
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Berkeley Natl Lab - DOE Contractor of Department of Energy posted this Solicitation on Nov 17, 2026. Responses are due Jan 8, 2027. NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors), product or service code 1230 (Fire Control Systems, Complete). Place of performance: California 94720. Solicitation number 2026-PTG-FACPR.

Solicitation details

General information

Solicitation number
2026-PTG-FACPR
Notice type
Solicitation
Place of performance
California 94720

Classification

NAICS
238210Electrical Contractors and Other Wiring Installation Contractors
Product or service
1230Fire Control Systems, Complete

Agency

Department
Department of Energy
Sub-tier
Department of Energy
Office
Berkeley Natl Lab - DOE Contractor

Description

From SAM.gov

The University of California, Lawrence Berkeley National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project").

The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems. 

The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site.

The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems. Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.

Documents

9 files

Subscribe to download these 9 files.

  • A_Statement of Work for Subcontract 7889840 %2810.12.26%29.pdf
    775 KB · Nov 17, 2026
    Download
  • B_FACPR_RFP_Attachment B - Factor Resoponse %2811.12.26%29.pdf
    277 KB · Nov 17, 2026
    Download
  • C_FACPR_RFP_Attachment C - Price Proposal %2811.12.26%29.pdf
    230 KB · Nov 17, 2026
    Download
  • D_Subcontract_FACRP %2811.12.26%29.pdf
    637 KB · Nov 17, 2026
    Download
  • E_GPs for Fixed Price Design-Build %2810.9.26%29.pdf
    344 KB · Nov 17, 2026
    Download
  • _FACPR_RFP %2811.12.26%29.pdf
    627 KB · Nov 17, 2026
    Download
  • F_Insurance Certificate Instructions %2810.09.26%29.pdf
    184 KB · Nov 17, 2026
    Download
  • G_Representations and Certifications Form.pdf
    284 KB · Nov 17, 2026
    Download
  • H_Small Business Subcontracting Plan %289.29.26%29.pdf
    339 KB · Nov 17, 2026
    Download

Similar open bids

Same NAICS 238210

More from Department of Energy

Open bids, other NAICS codes