ProposalWorkspaceFederal OpportunitiesDepartment of Transportation

HI FLAP CR562(1) Kilauea Point

Active 6982AF27B000008 SolicitationFederal Highway Administration
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

6982AF Central Federal Lands Divisi of Federal Highway Administration posted this Solicitation on Nov 17, 2026. Responses are due Dec 17, 2026. NAICS 237310 (Highway, Street, and Bridge Construction), product or service code Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways). Place of performance: Hawaii. Solicitation number 6982AF27B000008.

Solicitation details

General information

Solicitation number
6982AF27B000008
Notice type
Solicitation
Place of performance
Hawaii

Classification

NAICS
237310Highway, Street, and Bridge Construction
Product or service
Y1LBConstruction of Highways, Roads, Streets, Bridges, and Railways

Agency

Department
Department of Transportation
Sub-tier
Federal Highway Administration
Office
6982AF Central Federal Lands Divisi

Description

From SAM.gov

Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.

The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.

Documents

9 files

Subscribe to download these 9 files.

  • 6982AF27B000008. HI FLAP CR562%281%29 Kilauea Point.pdf
    36.1 MB
    Download
  • HI FLAP CR 562%281%29 Plans.2026.10.01.pdf
    57.2 MB
    Download
  • FP-14_Eng.pdf
    4.0 MB · Nov 17, 2026
    Download
  • HI FLAP CR 562%281%29_Kilauea Hyd Report_2026.10.01.pdf
    11.7 MB · Nov 17, 2026
    Download
  • Kilauea Horizontal Alignment.pdf
    43 KB · Nov 17, 2026
    Download
  • Kolo Horizontal Alignment.pdf
    25 KB · Nov 17, 2026
    Download
  • Pavement Design Report_09-2023.pdf
    6.8 MB · Nov 17, 2026
    Download
  • Schedule A Grading Summary.pdf
    231 KB · Nov 17, 2026
    Download
  • XYZ Reports for grade finishing stakes.zip
    60 KB · Nov 17, 2026
    Download

Similar open bids

Same NAICS 237310

More from Federal Highway Administration

Open bids, other NAICS codes