CG-Sea-C22 of US Coast Guard posted this Sources Sought on Nov 13, 2026. Responses are due Nov 29, 2026. NAICS 336611 (Ship Building and Repairing), product or service code J999 (Non-Nuclear Ship Repair). Place of performance: Washington 98134. Solicitation number 70ZU027ILREP1113.
This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this sources sought is to determine interest and capability of potential businesses. The Government may use responses to this sources sought synopsis to make an appropriate acquisition decision for this project.
The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for potential qualified contractors for the maintenance and support of the systems and equipment pertaining to the Integrated Propulsion Plant on Coast Guard Cutter (CGC) HEALY from 20JULY2028 – 21JULY2033.
GE Power, Power Conversion a Part of GE Vernova (GE) is the original equipment manufacturer (OEM) of the Integrated Propulsion Plant on CGC HEALY and holds the proprietary data rights to provide the required repair and support. The previous contract was awarded sole source to GE under contract number 70Z08523DLREP0003.
This work requires that the Contractor provide all management, supervision, personnel, labor, materials and equipment (except for Government furnished property) required to maintain and support the integrated machinery plant systems/components on CGC HEALY and Government owned shoreside equipment that is used in support of CGC HEALY. Support includes, but is not limited to, periodic equipment maintenance, technical representative visits, telephone consultations, remote technical support, hardware and software configuration management services, conditional technical support, upgrades, and periodic equipment training. A draft of the current awarded performance work statement is provided for information only.
This work includes, but is not limited to, the following:
The CGC HEALY is homeported in Seattle, WA at 1519 Alaskan Way S., Seattle, WA 98134. The CGC HEALY, the Coast Guard's largest vessel, is 420 feet long, 82 feet wide, drafts 31 feet (at full load), and weighs 16,660 long tons (at full load).
NAICS Code for this requirement: 336611 – Ship Building and Repairing
FSC Code for this requirement: J999 – Non-Nuclear Ship Repair (West)
Size Standard: 1,300 Employees
Please note that the period maintenance being performed will occur during planned dry dock and dockside availabilities, at which time other substantial depot-level maintenance will be accomplished.
No cost or pricing data is required. All responsible sources may submit a capability statement, which will be considered by the agency. If interested and capable of performing the work please respond to the attached questionnaire returning it via email to Contract Specialist Sherri Ore at Sherri.S.Ore@uscg.mil and Contracting Officer, Amy Kelm, at Amy.A.Kelm@uscg.mil. Please insert - Sources Sought Response to 70ZU027ILREP1113 in the subject line.