NASA Goddard Space Flight Center of National Aeronautics and Space Administration posted this Sources Sought on Nov 25, 2026. Responses are due Dec 9, 2026. Place of performance: Maryland 20771. Solicitation number 80GSFC23CA052_ROME_Value_Increase_Modification.
This is a Sources Sought notice to allow interested parties an opportunity to respond to this action. This is not a solicitation for proposals or quotes. No solicitation document exists at this time. This notice is being posted in accordance with NASA procurement transparency requirements to inform interested parties of the planned contract modification.
NASA's Goddard Space Flight Center (GSFC) is providing notice of a planned modification to increase the maximum ordering value of Contract Number 80GSFC23CA052 for the NASA GSFC Repairs, Operations, Maintenance, and Engineering (ROME) contract. The contract is currently held by ASRC Federal Facilities Logistics, LLC.
BACKGROUND:
The ROME contract is an Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract which provides comprehensive facility operations, maintenance, engineering, construction, and technical support services for GSFC facilities and the NASA Kennedy Space Center (KSC) Wallops Flight Facility (WFF) and the U.S. Navy tenant at WFF. The contract utilizes a hybrid structure with Cost-Plus-Fixed-Fee (CPFF) for operations and maintenance (O&M) services and Firm-Fixed-Price (FFP) for design and construction task orders. The contract period of performance ends on September 14, 2028.
JUSTIFICATION FOR VALUE INCREASE:
The value increase is primarily driven by GSFC's Center Transformation and Consolidation initiative, which involves consolidating operations currently located west of Goddard Road into facilities on the east side of the Center. The original contract value did not account for the magnitude of construction and renovation activities required to support this effort.
The consolidation initiative requires:
To date, more than 1,000 task orders have been issued under the ROME contract, with many additional requirements remaining. The cumulative value of these requirements represents a significant expansion of the construction workload beyond what was anticipated when the contract was originally awarded.
URGENCY:
Additional ordering capacity is urgently needed to execute the remaining consolidation requirements and to continue sustaining essential baseline O&M services through the existing contract end date. Without this increase, GSFC and WFF would not be able to continue baseline services, which would jeopardize critical facility operations supported by baseline O&M services and interrupt continuity of Center operations.
Additionally, GSFC and WFF would be unable to award planned construction task orders, which would:
No extension to the period of performance is requested. The value increase will ensure continuity of essential services while allowing the Center to execute the remaining consolidation requirements within the existing ROME contract period of performance.
The modification will be processed as a bilateral modification to the existing contract. Increasing the contract value does not itself obligate funds; individual task orders remain subject to funding availability and approval in accordance with established procedures.
Responses must be submitted within the response period of this notice. Responses submitted after the response period will not be reviewed. Responses shall be directed to Carol Wooten, Contracting Officer, via email at carol.r.wooten@nasa.gov.