ProposalWorkspaceFederal OpportunitiesDepartment of Defense

AFRL RISE 2808a AOI: Facility Alteration & Space Optimization – Bombers Directorate Hallway Project (Bldg 556)

Active FA2396-27-9CTBD SolicitationDepartment of the Air Force
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

FA8652 AFRL HQ AFRL/PK of Department of the Air Force posted this Solicitation on Nov 23, 2026. Responses are due Dec 4, 2026. NAICS 236220 (Commercial and Institutional Building Construction), product or service code Z1JZ (Maintenance of Other Miscellaneous Buildings). Place of performance: Ohio 45432. Solicitation number FA2396-27-9CTBD.

Solicitation details

General information

Solicitation number
FA2396-27-9CTBD
Notice type
Solicitation
Place of performance
Ohio 45432

Classification

NAICS
236220Commercial and Institutional Building Construction
Product or service
Z1JZMaintenance of Other Miscellaneous Buildings

Agency

Department
Department of Defense
Sub-tier
Department of the Air Force
Office
FA8652 AFRL HQ AFRL/PK

Description

From SAM.gov

This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria.

To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures.

Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.

Documents

4 files

Subscribe to download these 4 files.

  • 2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf
    134 KB · Nov 23, 2026
    Download
  • AOI Final OT Bombers.pdf
    173 KB · Nov 23, 2026
    Download
  • Bombers Heritage Hall diagram.pptx
    148 KB · Nov 23, 2026
    Download
  • Bombers Heritage Hall PWS - 13 Nov 26.docx
    198 KB · Nov 23, 2026
    Download

Similar open bids

Same NAICS 236220

More from Department of the Air Force

Open bids, other NAICS codes