W071 Endist Portland of Department of the Army posted this Sources Sought on Nov 17, 2026. Responses are due Dec 18, 2026. Solicitation number W9127N27R2185.
This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.
This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the Government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond.
The North American Industrial Classification Code (NAICS) for this requirement is: TBD. The approximate value of Project will be $5 to $25M.
Formal Sources Sought Response Due – before 3:00 pm Pacific on December 18th 2026.
1. Project Details and Background
The project is to upgrade the administration buildings at the US Government Moorings located on the west bank of the Willamette River (River Miles 6.08 to 6.21). This facility serves as the primary port, repair and supply base for the USACE Portland District Fleet, including dredges and hydro survey vessels. After a major fire at the facility, the Government is pursuing life safety and seismic upgrades to the facility.
2. Project Scope
This project will involve upgrading the Fire Protection systems to the Administration building, Machine Shop, Warehouse, Weld Shop, and sprinkler system to the Administration building and Weld shop and adding site lighting. This would also include life safety and code improvements within the same buildings.
Anticipated Construction Schedule: CENWP intends to advertise in May 2027 and award in July 2027. Construction Contract with estimated construction completion by the end of calendar year 2028.
Estimated Construction Cost (ECC): The current ECC is between $5,000,000 to $25,000,000
Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract. The acquisition strategy decision has not yet been determined. Maximum small business participation is being sought at both the Prime and subcontracting levels.
Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid.
Project Details: The following information represents the project objectives:
3. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically by e-mail to SUBJECT: US Moorings Life Safety Upgrade to Ian Lutjens at Ian.k.Lutjens@usarmy.mil and Brandon Lasich at Brandon.M.Lasich@usace.army.mil
Interested parties’ responses to this Sources Sought shall be limited to six (6) pages and shall include the following information:
4. Disclaimer and Important Notes.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.