On behalf of Copper River Native Association - Partial Demolition, Limited Contaminated Soil Removal, and Hazardous Materials Removal

Active (On behalf of CRNA) RFPEnvironmental ServicesCopper River Native Association
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Copper River Native Association (Alaska) posted this RFP on Nov 16, 2026. Responses are due Dec 18, 2026. Category: Environmental Services. Questions are due 2026-11-25. Solicitation number (On behalf of CRNA).

Solicitation details

General information

Solicitation number
(On behalf of CRNA)
Notice type
RFP
Place of performance
Alaska
Questions due
2026-11-25

Agency and category

Agency
Copper River Native Association
Category
008Environmental Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Copper River Native Association (CRNA), a Tribal Health Organization established through six Ahtna Tribes (Cantwell, Mentasta, Gakona, Gulkana, Tazlina, and Kluti-Kaah), is requesting proposals from qualified environmental contractors to complete targeted site cleanup activities at the Old Tazlina Laundromat property in Copper Center, Alaska under its Tribal Environmental Program (TEP) funded through the U.S. Environmental Protection Agency (EPA) 128(a) Brownfields Program.

The purpose of this project is to address environmental contamination and site hazards on the property and preserve the existing structure for potential future community use.

This RFP is being issued by CRNA to invite firms to submit proposals to respond to a partial site infrastructure removal, historic utility removal, and limited soil contamination removal for the Old Tazlina Laundromat site located in Copper Center, AK.

Scope

CRNA seeks a qualified contractor experienced in excavation of environmental materials, hazardous waste handling, and contaminated site closure activities.

Project Objectives

  • decommission and remove remaining tanks and associated piping
  • remove sanitary and sewer infrastructure where accessible
  • remove hazardous building materials and debris
  • excavate limited contaminated soil in targeted source areas
  • collect confirmation samples following removal activities
  • document waste handling and disposal in accordance with regulatory requirements

Scope of Work

1. Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) Development. Develop a project-specific Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) addressing all environmental sampling and analytical activities required under this Scope of Work. [...] No environmental sampling activities shall begin until the SAP/QAPP has received all required approvals.
2. Tank Decommissioning and Removal. Drain remaining liquids from existing tanks. Clean or purge tanks as necessary. Remove tanks from site (1,000-gallon propane AST, 1,500-gallon heating oil AST). Perform confirmation/characterization sampling beneath ASTs.
3. Fuel System Removal. Remove accessible fuel piping. Remove associated fittings, valves, and appurtenances. Excavate trench areas as necessary.
4. Sewer and Sanitary System Removal. Remove accessible sanitary piping. Remove catch basin/manhole structures. Excavate sediment remaining within piping. Remove associated bedding where required.
5. Targeted Soil Removal and Contamination Delineation. Remove up to 5 cubic yards of contaminated soil including excavation of up to 1 CY of contaminated soil at hotspot OTL-25-SS02. [...] Advance up to eight boreholes around sample location OTL-25-SS08 (within the building footprint) to define horizontal and vertical extent of contamination, collecting two samples per borehole while minimizing slab disturbance.
6. Hazardous Materials and Debris Removal. Remove fluorescent tubes. Remove ballasts. Segregate lead-containing materials if encountered. Remove household hazardous waste encountered onsite. Remove interior debris necessary to complete work (roughly 10 CY).
7. Confirmation Sampling. Following removal activities, contractor shall collect targeted confirmation samples [...].
8. Waste Documentation. Waste profiling, disposal manifests, transport documentation, hazardous waste coordination records.
9. Final Cleanup Report. Prepare and submit a draft Final Cleanup Report to CRNA for review. [...] Address CRNA comments and submit a final report in electronic format.
10. Community Engagement. Participate in two community meetings: one before site work begins and one after site work concludes. Develop a plain-language fact sheet summarizing the work performed.

Note that the building shell is to remain, and foundation removal should not be included.

Additional information

Submission

Proposals must be submitted to the CRNA Tribal Environmental Program in Word format, either electronically by email (preferred) or hard copy to the providing mailing address. Please adhere to the page limits and utilization of the 12-point font. Proposals must be received no later than **5:00 AKDT on December 18, 2026**. Proposals received after this time/date will not be considered.

Evaluation Criteria

  • Cover Letter (1 page): 5 Points
  • Proposal Narrative (10-page limit): 60 Points
  • Qualifications (8-page limit): 35 points

Proposal shall identify all anticipated subcontractors and their roles. Each proposal must demonstrate its compliance with the MBE/WBE program requirements pursuant to 40 CFR Part 33. Per CRNA policy, preference will be given to qualified Alaskan Native / American Indian entities and/or individuals.

All tasks must be overseen and signed off by a Qualified Environmental Professional in the State of Alaska.

Insurance

Contractor shall maintain all required insurance, including workers' compensation and general liability, in accordance with Alaska law and project-specific requirements, and shall provide certificates of insurance prior to commencing work.

Other

The selected contractor will be expected to sign a data sovereignty agreement with CRNA. CRNA reserves the right to reject all proposals.

Documents

1 file

Subscribe to get this document.

  • RFP for Old Tazlina Laundromat 2026.pdf
    Download

Similar open bids

In Alaska