Matanuska-Susitna Borough (Alaska) posted this RFP on Nov 25, 2026. Responses are due Dec 16, 2026. Category: Architecture & Engineering. Solicitation number 27-047P.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Matanuska-Susitna Borough is requesting proposals from qualified consultants for the design and construction management of proposed public water system improvements in the community of Talkeetna, Alaska.
The MSB is advancing water system improvements for the community of Talkeetna, including moving the existing water treatment plant (WTP) to a new location, installing a water storage tank (WST), modifying the existing WTP, installing a pumphouse and distribution system pumps or a gravity system, and installing a Supervisory Control and Data Acquisition (SCADA) system.
The project would benefit all existing customers (approximately 96 residential and 122 commercial) of the Talkeetna Sewer & Water System (TS&WS).
The MSB is pursuing the siting, design, and construction of a new WTP and WST to address identified deficiencies within the water system. The community has seen steady population and tourism growth since the original water system installation, along with increased concerns over the groundwater arsenic concentration, lack of water storage, failure to meet minimum pressure requirements, lack of alarm systems, and pipe corrosion.
Proposed Construction
Each alternative consists of roughly the same construction plan, which would consist of the following:
1. An exploration drilling plan for a test well will need to be developed and conducted to determine the new potential source’s water quality, quantity, well depth, well casing size, and flow direction. [...]
2. Develop engineering design and plans. The proposed water system will consist of a well pump and a distribution system. As needed, the raw water will be routed through the treatment process, and then treated water will be stored in a new WST. [...]
3. Acquire required environmental and construction permits. [...]
4. Land acquisition or agreements must be obtained for Alternatives 1, 3, and 5; see their respective sections for more information. [...]
5. Site Development could then commence and would include clearing, grubbing, and removing trees for temporary and permanent access to and on the preferred site. [...]
6. WTP modifications would consist of disconnecting the existing skid-mounted WTP and then moving it from the existing site to the site of the preferred alternative. Modification of the WTP’s chemical storage area to include a dedicated chemical storage room would also be completed. [...]
7. Construction would consist of conversion of the test well into a production well; installation of the new WST, installation of piping from the WTP to the WST; installation of the new pumphouse with distribution pumps (or gravity piping only for Alternative 5) and piping to the existing distribution system; installation of piping from the WTP to the backwash waste location; and installation of a chain-link fence to secure the facility.
8. Implementation of a SCADA system in the new pumphouse to provide overall water treatment system monitoring as well as an alarm system and emergency call-out capabilities.
9. Removing the previous WTP site from service is recommended, as maintaining and operating the old Well House, Well #1, Well #2, and other remaining facilities is costly and unnecessary with the proposed system’s increase in water storage.
Questions or requests for clarifications shall be directed to the Borough’s Purchasing Office. Questions or requests for clarification directed to any other member of the Borough staff, or consultants may be grounds for rejection of proposal as being irregular. E-mail questions to Purchasing@matsugov.us.