Scope of work includes partial demolition of various site amenities and utility protection at Auburndale Park including demolition of existing tennis courts, basketball courts, wooden shade structures, fencing, light poles, and more.
Scope of work includes partial demolition of various site amenities and utility protection at Auburndale Park including demolition of existing tennis courts, basketball courts, wooden shade structures, fencing, light poles, and more.
Demolition and Site Preparation
Demolition operations should be performed such that they minimize soil disturbance and protect the existing footings and improvements that are to remain. We recommend the geotechnical consultant review the extent of soil disturbance for the deeper demolition operations (i.e., footings, utilities, larger trees, etc.). Existing buildings, walls/fences, utilities, and other improvements that are to be protected in-place should be located and visually marked prior to grading operations. Excavations adjacent to improvements to be protected in-place should be performed with care so as not to undermine existing foundations or destabilize the adjacent ground. Stockpiling of soils (more than 5 feet in height) at or near existing structures and over utility lines should not be allowed without review by the geotechnical consultant.
Unsuitable earth materials, construction debris (concrete, pipelines, etc.) and trash should be removed prior to subgrade preparation and/or placement of fill. [...] Additional recommendations may be required upon geotechnical evaluation of the demolition operations and subgrade soil preparation.