Bid No. 08-27 E-rate Electronics Fiber‑Site Switch Modernization

Active Bid No. 08-27 RFPInformation TechnologySanta Ana Unified School District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Santa Ana Unified School District (California) posted this RFP on Nov 23, 2026. Responses are due Jan 14, 2027. Category: Information Technology. Solicitation number Bid No. 08-27.

Solicitation details

General information

Solicitation number
Bid No. 08-27
Notice type
RFP
Place of performance
California

Agency and category

Agency
Santa Ana Unified School District
Category
001Information Technology
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The District is performing a multi‑year modernization of all network electronics at campuses receiving new OS2 single‑mode backbone fiber. Fiber installation, termination, testing, and pathway remediation are performed under a separate Fiber Contract. The Electronics Contractor shall furnish, install, configure, activate, and document all new Cisco C9350 access switches and associated hardware.

Removal of all existing Cisco 2960X, 2960S, and older access switches and replacement with Cisco C9350 series switches, including full port‑for‑port mapping of all active user, phone, AP, and uplink connections.

Scope

Electronics Contractor Responsibilities:

  • Removal of all existing Cisco 2960X, 2960S, and older access switches as requested by SAUSD
  • Switch hardware (C9350), uplink modules, stack cables, stack power cables
  • Switch installation, configuration, cutover, testing, documentation, cabling vendor must certify it is 100% operational by testing and certifing cable prior to switch installation.
  • Stack configuration and redundancy validation
  • Uplink installation and uplink configuration
  • Professional Services defined in E‑TAB8
  • Coordination with Fiber Contractor for activation sequencing
  • No activation prior to fiber certification from cablers

Electronics Contractor Exclusions:

  • Fiber installation, termination, testing, or remediation
  • Copper cabling or AP cabling
  • Wireless access points (APs)
  • Any work at campuses not listed in E‑TAB5
  • Any materials not listed in E‑TAB6
  • Any Professional Services not listed in E‑TAB8

Modernization Scope Summary

  • 53 MDF closets
  • 348 IDF closets
  • 401 total closets
  • 1086 Cisco C9350 switches
  • 937 stacks (ring/linear/no‑stack)
  • 323 uplink modules
  • 800 hours Long‑Term Program Management (LTPM)

All quantities above are fully defined in E‑TAB3, E‑TAB4, E‑TAB6, and E‑TAB7.

Additional information

Bidder Instructions (mandatory)

  • All pricing shall be unit‑based. No lump‑sum, per‑site, per‑project, or mobilization fees are permitted.
  • No alternates or substitutions are permitted for any hardware or Professional Services.
  • All quantities listed in E‑TAB3 through E‑TAB8 represent the maximum modernization scope.
  • Actual installation quantities will be determined by SAUSD I.T. based on E‑Rate award and funding.
  • Bidders shall not impose minimum quantities, multipliers, staffing counts, or per‑closet labor estimates.
  • Extended Cost must be calculated strictly as: District Estimated Units (Qty) × Bidder Unit Price or Hourly Rate
  • Any deviation from this pricing model shall result in bid rejection.

District Notes

  • The District reserves the right to reduce scope based on E‑Rate funding.
  • All pricing must remain scalable downward without penalty including Professional Services.
  • SAUSD will not calculate or add tax.
  • All hardware unit prices shall be fully burdened and include all applicable sales tax.
  • Labor and Professional Services are not taxable and shall not include sales tax.

This liability includes latent defects discovered up to twenty‑four (24) months after the date of Substantial Completion.

Documents

3 files

Subscribe to get these 3 documents.

  • 20261123125750276 FINAL Electronics FiberSite Switch Modernization RFP 08-27.xlsx
    Download
  • 20261123125749746 Bid 08-27 SAUSD E-Rate Electronics Fiber-Site Switch Modernization.pdf
    Download
  • 20261123125749258 Bid 08-27 SAUSD E-Rate Electronics Fiber-Site Switch Modernization NOC.pdf
    Download

Similar open bids

In California

More from Santa Ana Unified School District

Open bids