Lake County (California) posted this IFB on Nov 13, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Solicitation number LAKECOUNTYCA-168.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Contractor shall furnish all labor, materials, tools, equipment, supervision, transportation, and installation services required for the following tasks, at a minimum, the project includes including excavating and stockpiling of soils and rock, geosynthetics installation, construction of the leachate collection and removal system (LCRS) gravel and piping, construction of the underdrain system, stormwater components, relocation of the existing sump pump and controls, extension of the electric and force main to the new sump location, and relocation of existing stormwater and landfill gas pipes.
Contractor shall furnish all labor, materials, tools, equipment, supervision, transportation, and installation services required for the following tasks, at a minimum, the project includes including excavating and stockpiling of soils and rock, geosynthetics installation, construction of the leachate collection and removal system (LCRS) gravel and piping, construction of the underdrain system, stormwater components, relocation of the existing sump pump and controls, extension of the electric and force main to the new sump location, and relocation of existing stormwater and landfill gas pipes.