Fairview Road Active Transportation Improvements, From Fair Drive to Adams Avenue, Federal Project No. STPL-5312(109), City Project No. 26-06

Active 26-06 IFBConstruction - Heavy & CivilCity of Costa Mesa
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Costa Mesa (California) posted this IFB on Nov 19, 2026. Responses are due Jan 14, 2027. Category: Construction - Heavy & Civil. Solicitation number 26-06.

Solicitation details

General information

Solicitation number
26-06
Notice type
IFB
Place of performance
California

Agency and category

Agency
City of Costa Mesa
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The scope of work consists of active transportation improvements to improve bicyclist and pedestrian safety and connectivity to low-stress facilities in the City. The project elements include construction of Class IV Cycle Tracks on both sides of Fairview Road, construction of raised bus boarding islands at the intersection of Fairview Road and Pirate Way/Mustang Way, removal and replacement of damaged curb and gutter and sidewalks, reconstruction of curb access ramps, storm drain improvements, relocation of traffic signal poles at two intersections, landscaping and irrigation, traffic striping, signing and appurtenant work.

Scope

Drawing Index

  • Title Sheet
  • Typical Sections
  • Curb Ramp Details
  • Bus Boarding Island/Bus Pad Details
  • Tapered Median Details
  • Center Median Details
  • General Details
  • Street Improvement Plan
  • Storm Drain Modification Plan
  • Striping Details
  • Signing and Striping Plan
  • Signing Schedule
  • Traffic Signal Modification Plan
  • Irrigation Plans & Details
  • Planting Plans & Details
  • Utility Plan

Construction Notes

  • Construct 1.5' wide concrete bikeway separator extruded curb per Detail 18 on Sheet 9.
  • Construct 6" PCC raised cycle track over 12" CMB.
  • Sawcut and remove existing curb ramp, curb & gutter, and sidewalk. Construct PCC ADA curb ramp per Caltrans Std. Plan A88A and A88B with detectable warning device (cast in place, yellow truncated dome), type and case per plan.
  • Sawcut and remove existing PCC/AC pavement. Construct monolithic 4" PCC bus boarding island over 4" thick CMB over compacted subgrade to 95% compaction per the special provisions and these plans. Bus boarding island to include railing and cast-in-place, yellow truncated domes.
  • Construct bicycle friendly curbside grating catch basin per SPPWC Std. Plan 303-4.
  • Construct 18" RCP from proposed curbside grating catch basins to existing catch basin.
  • Remove and replace existing landscape per landscaping and irrigation plans.
  • Install 6" wide white trapezoidal tactile warning delineator (TWD).
  • Relocate existing bus stop shelter and amenities. Contractor to coordinate with OCTA prior to performing any work.

Additional information

The contractor shall obtain all permits as required from the City of Costa Mesa and applicable governmental agencies before construction starts.

The contractor shall notify the City's Engineering Division two working days prior to start of construction. City Inspector must be contacted at least 48 hours before start of work.

All work, labor and materials shall be in conformity with the Standard Specifications and Plans for Public Works Construction (SPPWC or "Greenbook", latest edition), the Standard Specifications and Standard Drawings of the City of Costa Mesa (latest edition), Caltrans Standard Plans and Specifications (current edition), these plans, and the project construction documents.

Documents

2 files

Subscribe to get these 2 documents.

  • 20261119143754392 Plans - Fairview Rd Active Transportation Improvements STPL-5312(109).pdf