City of San Diego (California) posted this RFP on Nov 23, 2026. Responses are due Jan 7, 2027. Category: Construction - Building. Questions are due Questions received less than 14 Days prior to the Proposal due date may not be considered.. Solicitation number K-27-2505-DB1-3.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This is the City of San Diego’s (City) solicitation process to acquire Design-Build services for the Penasquitos Creek NP Comfort Station Design-Build project.
This is the City’s solicitation process to acquire Design-Build services for a Design-Build project to complete design and construction for Penasquitos Creek Neighborhood Park Comfort Station project.
Estimated project cost:** The City’s estimated cost for this project is **$1,540,000.00
Scope includes but not limited to a new comfort station, ADA Accessible Path of Travel, new potable water line and sewer connection for the new comfort station, new electrical service for the comfort station - connect site irrigation controller and security lighting controls to new electric panel in the building, and minor landscape improvements. For additional information refer to Attachment A.
The Project, including the Plant Establishment Period, shall be completed within 330 Working Days from the Notice to Proceed (NTP).
**Submission method:** Proposals will be received in electronic format (eBids) EXCLUSIVELY at the City of San Diego’s electronic bidding (eBidding) site, at: https://www.sandiego.gov/cip/bidopps/ and are due by the date, and time shown on the cover of this solicitation.
The proposer is to submit two separate files by the due date and time. The Technical proposal, which should contain the items detailed below and in Attachment G. There is to be NO PRICING information within this proposal. The Price proposal, which should detail the cost structure and include any forms as required herein.
This solicitation is subject to full and open competition and may be bid by Contractors on the City’s approved Prequalified Contractors’ List.
To be eligible for award of this contract, Prime contractor must possess the following licensing classification: A
Prior to the award of the Contract (or Task Order), the Design-Builders shall submit evidence of separate bonds and insurance as specified in Section 5-4, “INSURANCE,” of the City’s standard specifications for public works construction unless specified otherwise in the Contract Documents.
The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages: SLBE participation 5.6%, ELBE participation 4.4%, total mandatory participation **10.0%**.
The Proposer agrees to guarantee the Contract Price for a period of 120 days from the date of Bid opening.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.