PORTUGUESE BEND LANDSLIDE COMPLEX REMEDIATION – VEGETATION REMOVAL

Active PROJECT NO. 8304, 8310, 8311 IFBLandscaping & AgricultureCity of Rancho Palos Verdes
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Rancho Palos Verdes (California) posted this IFB on Nov 17, 2026. Responses are due Dec 7, 2026. Category: Landscaping & Agriculture. Solicitation number PROJECT NO. 8304, 8310, 8311.

Solicitation details

General information

Solicitation number
PROJECT NO. 8304, 8310, 8311
Notice type
IFB
Place of performance
California

Agency and category

Agency
City of Rancho Palos Verdes
Category
017Landscaping & Agriculture
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City seeks bids for advance **vegetation removal** within designated portions of the Portuguese Bend Landslide Complex in preparation for a separately contracted landslide remediation project.

Furnish labor, equipment and materials to document existing conditions, cut vegetation and selectively grub designated areas, remove and dispose of cuttings and identified loose channel debris, protect facilities and sensitive habitat, and install, inspect and maintain temporary erosion and sediment controls through the specified turnover.

The bid exhibits identify hand-work areas, haul access, well sites and payment limits. **Permanent remediation improvements and access-road grading are outside this contract.**

Scope

Clearing and grubbing means removing all vegetation, roots, stumps, rubbish and debris within the limits of work, then hauling all removed material off-site for legal disposal. There are two access roads requiring grading of the access road. Ground surfaces shall be left in a condition ready for the follow-on construction contracts.

The Contractor shall clear and grub approximately 53 acres as described below within the limits shown in red on the Clearing and Grubbing Footprint within the Portuguese Bend Landslide Remediation Complex Project Overview Map.

AREA A: BRIC 25 – GREEN AREA

  • Mobilization and Demobilization
  • Clearing and grubbing ACLAD HA #1, 2, 4 consists of clearing and grubbing 100-feet circumference.
  • Clear vegetation on access roads width 15-ft wide
  • Install temporary erosion control, straw wattles.

AREA B: BRIC 22 – ORANGE AREA

  • Mobilization and Demobilization
  • Clearing and grubbing ACLAD HA #5 consists of clearing and grubbing 100-feet circumference. Vanderlip Drive clearing and grubbing withing existing channel.
  • Grading access road, clearing and grubbing within 100-feet circumference for ACLAD-HA #3, total clearing and grubbing 35,039 square feet.
  • Clearing and grubbing – Upper Altamira Canyon clearing and grubbing for upper Altamira consists of approximately 50-feet wide by 1,600-feet length.
  • Clearing and grubbing – Lower Altamira Canyon clearing and grubbing of lower Altamira in existing channel approximately 3,800 linear feet.
  • Clearing and grubbing access road 15-ft wide and 25-feet around DDWs above Narcissa, approximately 41,090 square feet.
  • Temporary erosion control on cleared slopes (straw wattles, blankets).
  • Pre-construction site walk and photo/video documentation of existing conditions on private property.

AREA C: HMGP25 – BLUE AREA

  • Mobilization and Demobilization
  • Clearing and grubbing – Peppertree trail and Preserve Areas (including PBL-HA #1,2, 8-DDWs), approximately 1,254,950 square feet, 28.81 acres.
  • Clearing and grubbing – Portuguese Canyon, approximately 50-feet wide by 3200-feet length.
  • Clearing and grubbing – Ishibashi Canyon, approximately 50-feet wide by 690-feet length.
  • Clearing and grubbing – Paintbrush Canyon, approximately 50-feet wide by 600-feet length.
  • Clearing and grubbing – Culvert PVD South to Ocean, approximately 130-feet wide by 1,070-feet length, approximately 3.2 acres.
  • Grading access road, clearing and grubbing for DDWs at Archery Range, approximately 7,800 square feet.
  • Temporary erosion control on cleared slopes (straw wattles, blankets).
  • Pre-construction site walk and photo/video documentation of existing conditions on private property.

Additional information

BIDS MUST BE RECEIVED BY: December 7, 2026 at 4:30 PM

All quotes shall be made using **PlanetBids** via the link provided: https://vendors.planetbids.com/portal/48551/bo/bo-search

This work shall be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of work to be performed and materials to be furnished are approximate only, being given as a basis for the comparison of Bids. The actual quantities of work to be performed may vary at the discretion of the Director of Public Works.

Documents

1 file

Subscribe to get this document.

  • 20261117111750217 2026.11.16 Vegetation Removal Package - Revised SF Bid Schedule (Final) Reduced.pdf
    Download

Similar open bids

In California