County of San Benito (California) posted this RFP on Nov 16, 2026. Responses are due Nov 30, 2026. Category: Environmental Services. Questions are due 2026-11-30 17:00. Solicitation number OpenGov-671846c8.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The County of San Benito Planning and Building Department requests proposals with a scope of work, timeline, and cost for the preparation of an initial study pursuant to the California Environmental Quality Act (CEQA), Public Resources Code (PRC) Division 13 and CEQA Guidelines, California Code of Regulations (CCR), Title 14, Division 6, Chapter 3, Article 5, Section 15063, for County Planning file PLN250084, a proposed tentative map (TM) at 3586 Airline Hwy at Ridgemark Drive, in unincorporated San Benito County.
Note that a CEQA mitigated negative declaration (MND) was previously adopted for a senior living project for the parcel with APN 020-330-010, including maps, photographs, narrative descriptions, air quality analyses, biological surveys, geotechnical report, acoustical analysis, and traffic impact analysis. The scope of work, timeline, and cost should take into consideration the extent to which the previous analyses and supporting documents may be utilized and updated and whether an addendum, supplemental or subsequent MND may be an appropriate CEQA document for the project.
The consultant’s role will consist of the preparation of an Initial Study leading to either the preparation of subsequent CEQA document or new CEQA document and Mitigation Monitoring and Reporting Program (MMRP) with supporting documents as needed according to the requirements of CEQA at a level of detail suitable for the project, circulation of the environmental document for public comment, response to comments, preparation of Notice of Determination, preparation of material for the public hearing for planning commission including draft staff reports, draft resolutions/CEQA findings and project presentation at public hearings(s). The level and scope of services requested by the County are driven by reduced Planning staffing levels, which are expected to persist due to ongoing County budget constraints.
Traffic Impact Analysis
As requested by both CalTrans and San Benito County Public Works, the consultant or subconsultant shall ensure preparation of a comprehensive Traffic Impact Analysis (TIA) that addresses applicable County Public Works requirements and Caltrans review requirements [...]. The TIA shall evaluate the project's potential transportation impacts on the County roadway network and State Highway System, including SR 25, and shall include ITE-based trip generation, distribution, and assignment for the proposed 90 attached multifamily residential units and 7 detached single-family residential units; existing and cumulative traffic conditions; intersection operational analysis; and evaluation of project access and potential secondary ingress/egress connections. [...]
Supporting analyses, calculations, and exhibits shall be provided, and the consultant or subconsultant shall coordinate with Caltrans and County Public Works, address agency comments, and identify necessary transportation improvements and mitigation measures to support the CEQA environmental review.
Submission
Proposals must be electronically received by the due date via the OpenGov system. An electronic proposal shall be uploaded to OpenGov. Please submit one electronic copy of a proposal. Incomplete proposals and proposals not organized according to this format may be rejected.
All completed proposals submitted by **5:00 pm, Monday, December 7, 2026**, will be evaluated by County staff.
Evaluation Criteria
A review committee will review and qualify proposals by end of business December 21, 2026 (two weeks). The Director of Planning and Building or designee will make the final determination and award based on the recommendation from the internal review committee.
All costs shall be stated as "not to exceed" amounts. Insurance Limits and Terms and Conditions will be discussed and confirmed during this process. The County will issue a Notice to Proceed to the selected consultant.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.