RFQ #2026079 - Portable Emissions Measurement System (PEMS)

Active 0000040902 RFQLaboratory & ScientificCalifornia Air Resources Board
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

California Air Resources Board (California) posted this RFQ on Nov 9, 2026. Responses are due Nov 23, 2026. Category: Laboratory & Scientific. Questions are due 2026-11-17 17:00. Solicitation number 0000040902.

Solicitation details

General information

Solicitation number
0000040902
Notice type
RFQ
Place of performance
California
Questions due
2026-11-17 17:00

Agency and category

Agency
California Air Resources Board
Category
025Laboratory & Scientific
Source listing
Link with a plan

Description

From the agency listing

This procurement is for the Portable Emissions Measurement System.

The off-road portable emissions measurement section (ORPEMS) uses portable emissions measurement systems (PEMS) to measure real-world exhaust emissions from the off-road and nonroad sectors, including but not limited to, construction and agricultural machinery, locomotives, cranes, and small off-road engines (SORE), under normal operating conditions. These measurements provide critical data for CARB¿s compliance, surveillance, inventory, and research programs pursuant to CCR Title 13 and CFR Title 40.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The off-road portable emissions measurement section (ORPEMS) uses portable emissions measurement systems (PEMS) to measure real-world exhaust emissions from the off-road and nonroad sectors, including but not limited to, construction and agricultural machinery, locomotives, cranes, and small off-road engines (SORE), under normal operating conditions. These measurements provide critical data for CARB's compliance, surveillance, inventory, and research programs pursuant to CCR Title 13 and CFR Title 40. [...] Therefore, ORPEMS must procure additional 1065 compliant PEMS units that are compatible with the HORIBA gas divider. Expanding and diversifying the PEMS inventory will increase testing capacity, enhance operational flexibility, and enable multiple test campaigns to run concurrently.

The contractor (TBD) will provide the State of California Air Resources Board (CARB) with two complete sets of Portable Emissions Measurement Systems (PEMS).

Scope

General Specifications

  • Gas PEMS must be fully compliant with 40 CFR Part 1065 for all applicable gaseous pollutants, including at minimum CO₂, CO, NOx, THC (FID), CH₄ (FID).
  • Must include all connections and cables to fulfill the compliance work.
  • Sample heated line – at least 5 meters
  • Initial 1065 Calibration before shipment
  • Must be compatible with Horiba Gas Divider

Operating and Service Manual

  • The vendor shall provide one User Guide (printed or electronic, English).
  • The vendor shall provide any necessary calibration information (printed or electronic, English).
  • Initial 1065 Calibration Reports

Measurements Requirement

  • THC: 0 – 30,000 ppmC1 (2C-FID)
  • CH4: 0 – 10,000 ppmC1 (2C-FID)
  • NO: 0 – 1,500 ppm (NDUV)
  • NO2: 0 – 1,000 ppm (NDUV)
  • CO: 0 – 8 vol.% (NDIR)
  • CO2: 0 – 18 vol.% (NDIR)

Power Requirements

AC 110 60 Hz

Data Input and Output

PEMS must record data at a minimum of 1Hz frequency. Raw data should be readily available in an easily accessible format, preferably CSV, to facilitate further analysis with different data analysis tools.

Installation and Commissioning

The contractor shall install the equipment and provide CARB staff training at the following address:: 4001 Iowa Ave, Riverside CA 92507. On-site installation of the instrument must be arranged within 30 days of delivery. On-site installation, commissioning, and training provided at the CARB facility for 4 days. Training includes, but is not limited to, instrument operations, troubleshooting methods, data retrieval, and data processing.

Gas PEMS Preventative Maintenance/Extended Warranty

The vendor shall provide a two-year warranty to ensure regulatory compliance. The warranty shall include all required preventive maintenance for the Gas PEMS and all associated components, in accordance with the manufacturer's recommended procedures and maintenance schedules.

Please see Exhibit B-1, Cost Worksheet for the full list of items requested. Comparable versions may be accepted.

Additional information

All Bids received by CARB must be submitted by **email** to Courtney.Nguyen@arb.ca.gov by the dates and times shown. The email containing the Bid must be plainly marked "BID," with the RFQ number and Bidder's firm name in the subject line: RFQ #2026079 – BIDDER'S FIRM NAME – BID. Bids submitted or delivered via any other method will not be accepted.

Quotes packet must be received no later than **5:00 PM (PT)** on **November 23, 2026**. By submitting the bid, bidders certify that quoted pricing shall remain valid for a minimum of **thirty (30) days** following the RFQ response due date.

Quotes not including the proper required documentation shall be deemed non-responsive and shall be rejected. Attachments A through L and Exhibits A and B-1 are described in Section G, *RFQ Response Content*.

Award, if made, will be to the lowest responsive and responsible bidder. If more than one item is specified in this solicitation, the lowest responsible bidder will be determined based on all or nothing basis.

The resulting contract will be a Purchase Order (PO). Upon PO execution, products must be delivered within **45 working days** after receipt of the order. Freight: FOB Destination Only for this RFQ.

Documents

1 file

Subscribe to get this document.

Similar open bids

In California

More from California Air Resources Board

Open bids