City of Santa Cruz (California) posted this RFQu on Nov 16, 2026. Responses are due Dec 15, 2026. Category: Architecture & Engineering. Questions are due 2026-12-04. Solicitation number RFQ No. Parks and Recreation -0335.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Santa Cruz (City) is issuing this Request for Qualifications (RFQ) dated Nov. 16, 2026 for an Engineer (Engineer) to prepare concept and final engineering plans and specifications for the construction of the Santa Cruz Wharf South Landing.
The 2014 Santa Cruz Wharf Master Plan (WMP) as revised and approved in 2024 envisions the construction of the Santa Cruz Wharf South Landing (Project) located at the seaward end of the Santa Cruz Wharf between Bents 148-169. The City intends to immediately proceed with planning, environmental review, and permit application for the Project, and complete construction by no later than 2034.
Engineer Scope of Services
Deliverables
Submission
All proposals must be received at the Parks and Recreation Department, located at 337 Locust St., Santa Cruz, CA, by **1:30 PM on Dec. 15, 2026** in sealed envelopes. Proposals must consist of one printed hard copy and one digital copy that includes all information in the format outlined in this RFQ. The digital copy must be saved as a searchable PDF document on a USB drive. Engineer’s Fee Proposal must be submitted in a sealed envelope with Engineer’s main proposal.
RFQ submittals shall be submitted utilizing the Engineer’s Proposal form provided in Exhibit A.
Failure of an Engineer to attend the **mandatory** Pre-Submittal Site Inspection shall result in any proposal submitted by that Engineer being deemed non-responsive and will not be considered.
Addenda to this RFQ may be issued prior to the proposal opening date through City’s OpenGov procurement portal.
Ranking Criteria
Total: 100
Within ten (10) calendar days after receiving written notice that the contract has been awarded, the selected Engineer shall return to City the signed Professional Services Agreement, insurance certificates, and all other documents as required by the RFQ.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.