Thermoplastic Traffic Striping Material and Paint, Waterborne Traffic Line

Active 0000040314 IFBConstruction - BuildingCalifornia Department of Parks and Recreation
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

California Department of Parks and Recreation (California) posted this IFB on Nov 10, 2026. Responses are due Nov 16, 2026. Category: Construction - Building. Questions are due 2 p.m., Seven (7) Calendar Days prior to the bid opening date. Solicitation number 0000040314.

Solicitation details

General information

Solicitation number
0000040314
Notice type
IFB
Place of performance
California
Questions due
2 p.m., Seven (7) Calendar Days prior to the bid opening date

Agency and category

Agency
California Department of Parks and Recreation
Category
005Construction - Building
Source listing
Link with a plan

Description

From the agency listing

C26645003 Roof replacement on the visitor center building located at Weaverville Joss House State Historic Park in Weaverville, CA. This is a CERTIFIED SMALL/MICRO BUSINESS (S/MB) OPTION SOLICITATION - There is a **MANDATORY** JOB WALK: November 16, 2026 at 11 AM. PLEASE NOTE: No bid will be considered from a Prime Contractor that did not attend the ENTIRE MADATORY JOB WALK.

**REQUIRED** CONTRACTOR'S LICENSE: C-39 Roofing Contractor

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This is a CERTIFIED SMALL/MICRO BUSINESS (S/MB) OPTION SOLICITATION; therefore, normal advertising, bidding and protest procedures DO NOT apply to this method of solicitation.

The purpose of this contract is to remove and replace roof on one (1) state owned building, the Weaverville Joss House Visitor Center, according to the plans and specifications included in the scope of work, Exhibit A, Exhibit A- Attachment I, Exhibit B attachment I, Exhibit D- project manual and as directed by the State's Representative. Once the work is completed the site shall be clean and safe from any construction debris.

The contractor shall furnish all labor, materials, permits, licensing, insurance, tools, supplies, equipment and all other items of expenses including transportation and disposal cost necessary to remove the existing roof materials and install a new roof.

Scope

Scope of Work

Weaverville Joss House, Visitor Center Roof - Approximately 2,235 Square Ft.

Contractor shall remove the entirety of the wood shake roof, repair or replace as needed any damaged skip sheathing, eve boards, rafter tails, wood framed gutters and fascia.

  • All repairable items will be repaired to maintain their original appearance. All removed items will be replaced in kind, keeping the original appearance and material type to the extent possible.
  • Any damaged skip sheathing shall be replaced with matching lumber and attached to the existing rafters with 8d nails.
  • All fascia, eave boards, wood framed gutter, rafter tale beams and any replaced skip sheathing shall be sanded, caulked, primed, and painted before installing the new roof.
  • Approximately three (3) metal caps will be installed on the beams sticking out past the roof and painted to match if missing.

Contractor shall install new valley, fascia drip edge flashing, roof penetration flashing, fire-rated ridge vents, new peel-and-stick weatherproof membrane and a new composite polyurethane synthetic shake roofing. CeDUR class A fire-rated synthetic shake roof "or equivalent".

  • New drip edge, valley, roof penetration and ventilation vents will be installed and painted to match the roof, rafter tale beams or fascia.
  • The ventilation vents must be class A fire rated and installed where there is attic space.
  • There must be ridge vents like the Rapid Ridge "or equal".
  • There must be enough vents to ensure proper circulation based on the square footage of the attic space.
  • All work shall be performed in strict compliance with the products' manufacturing specifications and applicable codes, standards, and regulations.

Inspections

State Park representative will inspect the roof after the wood shakes have been removed and the roof has been prepped for the weather proofing and flashing install. Rep will inspect again after the repairs have been made to any damaged wood to include the skip sheathing, fascia and wood framed gutter before painting occurs. State Park representative will also inspect after the painting, and the weather proofing membrane and flashing have been installed before any shingles can be installed. State Park representative will also inspect the installation of the shingles as the work proceeds.

Additional information

Submission

Bids must be submitted electronically with all necessary fully executed documentation attached in a Portable Document Format (PDF) via email at: taneya.sperling@parks.ca.gov, until **1 PM on December 1, 2026**, at which time they will be publicly opened and read over conference call. Submissions with attached PDF documentation in excess of 10 Megabytes in size risk being rejected and can be deemed non responsive.

**Mandatory** job walk: No bid will be considered from a Prime Contractor that did not attend the ENTIRE MADATORY JOB WALK.

**Required** contractor's license: C-39 Roofing Contractor.

Bids shall include valid proof of Bidder's Contractor's State Licensing Board License pocket square with expiration; Bidder's Business License for the county or city of Bidder's business' domicile; and Bidder's Department of Industrial Relations Public Works Contractor Registration.

Award and Bonds

If the contract is awarded, it will be awarded to lowest responsible bidder whose bid complies with all prescribed requirements. Bids shall have enclosed cash, a cashier's check, certified check, or a bidder's bond [...] in an amount equal to at least 10 percent of amount of bid. Bond requirements for contracts exceeding $5,000 are stated in the General Conditions, DPR 483, Section 00700.

Contract Term

CONTRACT LEGAL TERM: Upon Notice to Proceed through One Year. PERFORMANCE PERIOD: 60 Calendar Days From Notice to Proceed. Project is estimated to start in Spring of 2027.

PAYMENT TERMS: LUMP SUM PAYMENT WILL BE MADE BY THE STATE PURSUANT TO THE TERMS AND CONDITIONS DISCLOSED IN THE BUDGET DETAIL & PAYMENT PROVISIONS (DPR 604PWL) UPON COMPLETION AND INSPECTION OF PROJECT.

Documents

3 files

Subscribe to get these 3 documents.

  • 01_C26645003.Project_Manual.NBD.Joss_House_VC.Roof.pdf
    Download
  • 02_C26645003.Sample_Docs.NBD.Joss_House_VC.Roof.pdf
    Download
  • 03_C26645003.Bid_Docs.NBD.Joss_House_VC.Roof.pdf
    Download

Similar open bids

In California

More from California Department of Parks and Recreation

Open bids