Alternatives Analysis and Environmental Planning for New Bus Facility (10% SBE Goal)

Active RFP 126DX001 RFPEnvironmental ServicesRegional Transportation District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Regional Transportation District (Colorado) posted this RFP on Nov 12, 2026. Responses are due Dec 15, 2026. Category: Environmental Services. Solicitation number RFP 126DX001.

Solicitation details

General information

Solicitation number
RFP 126DX001
Notice type
RFP
Place of performance
Colorado

Agency and category

Agency
Regional Transportation District
Category
008Environmental Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Regional Transportation District (RTD) is seeking consulting services to conduct environmental planning work necessary to support the development of a new bus operations and maintenance facility. A new facility has been identified in the agency’s long-range plans, including Reimagine RTD, completed in 2022, which analyzed RTD’s existing bus operations facilities and determined that RTD’s existing facilities were not adequate to meet the growing needs of the Denver region. [...] RTD’s Facilities and Fleet Transition Plan (FFTP), completed in 2024, also supported the need for a new bus maintenance facility and identified three RTD-owned properties as potential locations for this facility.

The consultant selected to perform this work will complete an Alternatives Analysis (AA) to identify a preferred site, complete Environmental Documentation required under the National Environmental Policy Act (NEPA) for development of the preferred site, complete a Title VI facility siting equity analysis for the proposed project, complete Preliminary Engineering (PE) to include concept site design and facility plans, conduct Stakeholder/Public Engagement, develop a Funding Strategy, and assess the impact of this facility against the implementation plan for the FFTP.

Scope

The Scope of Work (SOW) for this project includes all requirements to identify a location for a bus operations and maintenance facility with a capacity to serve at least 150 buses. It will include an Alternatives Analysis (AA) prior to initiating an environmental study consistent with the National Environmental Policy Act (NEPA), a preliminary design program for the facility site and buildings, and recommendations for an implementation strategy for the new facility.

Summary of Project Tasks

  • Project Management: Maintain overall management and control of the project from start to finish.
  • Alternatives Analysis (AA)/Title VI Equity Analysis: Confirm the Purpose and Need and analyze up to five sites, plus a no-build scenario, for suitability of a new bus operations facility.
  • NEPA: Complete the NEPA process, including necessary documentation and public involvement, to ensure environmental compliance.
  • Stakeholder/Public Engagement: Conduct engagement with stakeholders and with the public necessary to advance the study.
  • Preliminary Engineering (PE): Concurrent with the NEPA process, create space programming and preliminary design plans for the selected site, sufficient to support the NEPA process and inform future design phases.
  • Funding Strategy: Since funding for construction is not yet identified, develop a strategy for acquiring the funding necessary to advance the project through construction.
  • FFTP Reassessment: Assess how a new bus operations facility will integrate into RTD’s Facilities and Fleet Transition Plan (FFTP).

Deliverables

  • Project Budget, Project Schedule, Project Organizational Chart and Contact List, Project Templates, and Draft Final Report and Appendix Outline
  • Alternatives Analysis Final Report and Title VI Facility Siting Equity Analysis Report
  • Completed FTA CE Worksheet and technical reports (Land Use, Cultural Resources, Air Quality, Environmental Justice, Traffic)
  • Community and Stakeholder Engagement Plan
  • Facility Programming Report (including “report-level” conceptual design) and Facility Design Files (CADD)

Additional information

RTD anticipates this project will take approximately two years to complete from Notice to Proceed (NTP). RTD expects that consultants responding to this RFP will provide a refined and more detailed schedule that ensures completion of the project within the proposed two-year contract period.

This project shall utilize a time and materials (direct cost) approach for invoicing, but it shall incorporate an earned value management (EVM) reporting approach to measure progress toward the completion of the overall project and each project deliverable.

The Consultant is expected to conduct site visits to gather information sufficient to complete this analysis and develop a scoring matrix to compare and rank alternatives.

RTD has identified the specific tasks of work required in its proposed scope of work and schedule, but proposers may modify the task contents, sequence, and durations to align to their own strategy for completion and best practice experience.

Documents

5 files

Subscribe to get these 5 documents.

  • 126DX001_Form_of_Contract.pdf
    Download
  • Appendix_B_-_Disability_Community_Engagement_Plan.pdf
    Download
  • 126DX001_Appendix_C_-RTD_FFTP_Facility_Siting_Analysis.pdf
    Download
  • SOW_New_Bus_Facility_Final_Revised_16_Oct2026.pdf
    Download
  • Alternatives_Analysis_and_Environmental_Planning_for_New_Bus_Facility_(10%_SBE_Goal).pdf
    Download

Similar open bids

In Colorado

More from Regional Transportation District

Open bids