Town of Wallingford (Connecticut) posted this ITB on Nov 12, 2026. Responses are due Dec 17, 2026. Category: Environmental Services. Questions are due 2026-12-08 17:00. Solicitation number 26-055.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of Wallingford is seeking a qualified contractor to furnish and install replacement Grit Tank Screws at the Water Pollution Control Facility for the Wallingford Sewer Division.
The Town of Wallingford Sewer Division of the Wallingford Department of Public Utilities is seeking to retain a qualified Contractor to furnish and install replacement of the two (2) existing grit tank screw assemblies and associated components at the Town of Wallingford Wastewater Pollution Control Facility (WPCF) located at 155 John Street, Wallingford.
The Contractor shall be responsible for locating vendors capable of furnishing the specified replacement equipment and components. The replacement equipment shall meet the dimensions, materials, configuration, and other requirements identified in Line Item 1 and Line Item 2 in Section 3.4.1. The Contractor shall submit proposed vendor(s) and equipment information to the Sewer Division for review and approval prior to purchase.
Replacement work shall be performed during the low-flow period approved by the Sewer Division. Low-flow periods are generally anticipated during the late summer or winter months.
The WPCF is equipped with two (2) grit tanks. Only one (1) grit tank shall be removed from service at a time. At no time shall both grit tanks be removed from service without prior written authorization from the Town. Work on the second grit tank shall not commence until the first grit tank has been completed, tested, and returned to satisfactory operation. Once work commences on an individual grit tank, the Contractor shall complete the installation and return the grit tank to satisfactory operation within seven (7) consecutive calendar days. Following installation, each grit screw assembly and associated drive system shall be tested under operating conditions and shall be demonstrated to operate satisfactorily prior to acceptance by the Sewer Division.
The Contractor shall coordinate the project schedule with the Sewer Division prior to commencement of work.
The Contractor shall examine the existing equipment and site conditions and shall verify all dimensions, connections, clearances, and other field conditions necessary to furnish and install the replacement equipment.
All materials, replacement components, Contractor-furnished equipment, tools, rigging, and other items necessary to complete the work shall be delivered and staged at the WPCF prior to commencement of work on an individual grit tank.
**Submission method:** Bidders submitting electronically must upload the *Invitation to Bid* to the Euna Bonfire Portal. For those NOT submitting electronically, sealed proposals will be received by the Purchasing Agent for the Town of Wallingford, in Room 206, Town Hall, 45 South Main Street, Wallingford, Connecticut, 06492.
A signed *Invitation to Bid* form is **required** or your bid will be rejected. Proposals received later than the time and date specified will not be considered.
The Town of Wallingford intends to award the bid to the responsive and responsible bidder offering the lowest total cost for the specified work.
Payment Terms will be Net 30 unless specified otherwise.
Insurance: Liability - See General Terms & Conditions.
Bid surety: None. Performance bond: None.
The Contractor should furnish, with the bid, evidence of at least five (5) years of experience with similar work, and a reference list which includes five (5) projects.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.