City of Norwalk (Connecticut) posted this ITB on Nov 12, 2026. Responses are due Jan 5, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-15 14:00. Solicitation number 4546.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The proposed project consists of an upgrade to the Broad River Baseball Complex as well as a Major Storm Drainage Upgrade Project under the baseball fields (and Alternates to the extent that funding permits).
Base Bid
The Project includes, but is not limited to providing all labor, materials, supervision, obtaining required permits, etc. for the Project. The awarded bidder is also responsible for most incidentals related to this work such as any required Maintenance & Protection of Traffic due to the Site work, driveway or bituminous concrete sidewalk replacement, the resetting of structures, Anti-Tracking Pad, Silt and Erosion Control Measures (including necessary maintenance) and site restoration as necessary to complete the Project scope of work.
Bid Add/Alternates
The work under this Project shall be totally completed by no later than **April 1, 2028**.
Submission
The City of Norwalk is allowing for electronic submission along with hard copy submission. All participants are **required to submit both** by the said date and time. Hard copy submission must match the electronic submission and will be the official accepted submission. All electronic submissions must be submitted in Bonfire no later than **Tuesday, January 5, 2027, at 2:00 P.M.** All sealed hard copy Bids should be submitted to the City of Norwalk's Purchasing Department no later than **Thursday, January 7, 2027 at 2:00 p.m.** Bids are opened publicly and read aloud.
Evaluation
The determination of the Successful Awarded Bidder will be based upon the lowest responsible bidder for the combination of the sum of the total amount of the Base Bid and any one, or all of the Alternates; examples of previous completed Storm Drainage and Baseball Complex projects, 10 years of experience, and 5 similar projects completed within the past 5 years; ability to ensure the Project Work is completed by April 1, 2028; history of completing Projects on schedule; and the City's available funding.
Bonds
All bids **must** include a certified check or bid bond in the amount of **15%** of the total bid amount. The successful bidder will be required to furnish a performance bond, and a labor and materials bond for the amount of the total bid prior to signing a contract.
Compliance
There is **$2,630,488.00** in State-Funding for this project. The SBE goal for this project is **$243,564.00**. The MBE goal for this project is **$146,138.00**. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.
Subscribe to get these 2 documents.