Roof Repairs and Rehabilitation

Active 04-27-AIR RFPConstruction - BuildingCity of New Smyrna Beach
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of New Smyrna Beach (Florida) posted this RFP on Nov 16, 2026. Responses are due Jan 8, 2027. Category: Construction - Building. Questions are due 2026-12-15 17:00. Solicitation number 04-27-AIR.

Solicitation details

General information

Solicitation number
04-27-AIR
Notice type
RFP
Place of performance
Florida
Questions due
2026-12-15 17:00

Agency and category

Agency
City of New Smyrna Beach
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of New Smyrna Beach, Florida (the “City”) is seeking proposals from qualified and properly licensed contractors to provide roof repair and rehabilitation services for the George Baker Aviation, Inc. facility. George Baker Aviation, Inc. is an aviation maintenance and avionics business located at 333 South Street. The property is associated with the City-owned Airport, and current City solicitation documents identify the New Smyrna Beach Municipal Airport as the owner for purposes of the hangar roof rehabilitation project. There are two (2) hangars located at the project site. The required work under this solicitation applies to the south hangar, which is identified in Attachment D.

Proposals shall include a solution that provides an optimal return on investment, with durability, cost, and warranty considered primary factors in determining the proposed solution.

Scope

The work to be performed under this contract includes furnishing all labor, materials, supervision, equipment, incidentals, and other items necessary to complete the project in accordance with the specifications contained herein. The project shall be completed on a turnkey basis and in compliance with all applicable federal, state, county, and City requirements, including applicable building codes and safety standards.

Submitted proposals shall include:

  • A detailed description of the existing roof conditions including photographs, measurements, and recommended materials to perform the rehabilitation.
  • A description of the proposed repair and/or replacement of defective (failed or compromised) roof panels, structures, and associated materials with the goal of restoring the roof to a weathertight, dried-in, and reliably durable condition.
  • A Rough Order of Magnitude (ROM) of cost to provide the OWNER the recommended roof solution.
  • Warranty duration and coverage details.

OWNER is receptive to all rehabilitation methods, including sealing, replacement, or a combination of both.

**Minimum Required Result:** Regardless of the rehabilitation method proposed, the completed Work shall restore the south hangar roof identified in Attachment D to a continuous, weathertight condition, with no water intrusion through the roof areas and components included in the final agreed scope. [...] Sealing, replacement, or a combination of methods may be proposed, provided the proposal explains how the solution will achieve the required result.

**Required Scope Detail:** In addition to the information required above, each proposal shall identify the roof areas and quantities included, supported by measurements and photographs, and specify the treatment of roof panels, seams, fasteners, flashings, penetrations, roof edges, and drainage components, as applicable. [...]

**Materials and Installation Requirements:** Each proposal shall identify the proposed materials and rehabilitation system, including manufacturer and product information, surface preparation, installation procedures, and applicable manufacturer requirements. [...] The Proposer shall state the anticipated service life of the proposed solution, the basis for that estimate, and the maintenance necessary to achieve it.

Additional information

**Submission method:** Responses must be submitted electronically to https://procurement.opengov.com/portal/cityofnsb. All required documents shall be completed and submitted through the City’s eProcurement Portal.

There will be a **Mandatory** Pre-Proposal Meeting held on Wednesday, December 2, 2026, at 11:00 am at 333 South Street, New Smyrna Beach, Florida 32168 (George Baker Aviation). Attendance at the pre-proposal meeting is **required** in order to submit a proposal. A site visit will immediately follow the Pre-Proposal Meeting.

Minimum Qualifications

  • Licenses and Certificates: Respondents are required to possess the correct professional license and authorizations necessary to perform the work in accordance with all applicable federal, state, and local laws, statutes, ordinances, and rules and regulations. The applicable license(s) shall remain active throughout the duration of the Contract.
  • Experience: Proposer shall have a minimum of five (5) years of demonstrated experience performing commercial roofing rehabilitation, repair, replacement, coating, sealing, or similar roofing work of comparable size and complexity.
  • Similar Projects: Proposer shall provide a minimum of three (3) references for similar commercial roofing projects completed within the past five (5) years.

Proposals shall include a solution that provides an optimal return on investment, with durability, cost, and warranty considered primary factors in determining the proposed solution.

Documents

6 files

Subscribe to get these 6 documents.

Similar open bids

In Florida

More from City of New Smyrna Beach

Open bids