2026-012 COMPREHENSIVE PLAN UPDATE

Active PE-66084-NONST-2027-000000062 RFPProfessional ServicesCity of Thomasville
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Thomasville (Georgia) posted this RFP on Nov 16, 2026. Responses are due Dec 17, 2026. Category: Professional Services. Questions are due 2026-11-30 16:00. Solicitation number PE-66084-NONST-2027-000000062.

Solicitation details

General information

Solicitation number
PE-66084-NONST-2027-000000062
Notice type
RFP
Place of performance
Georgia
Questions due
2026-11-30 16:00

Agency and category

Agency
City of Thomasville
Category
003Professional Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Thomasville (City) is issuing this Request for Proposals (RFP) for comprehensive planning services. The resulting Comprehensive Plan shall comply with all applicable requirements of the State of Georgia while building upon the City’s existing Thomasville: Blueprint 2028 Comprehensive Plan to address Thomasville’s long-range planning and implementation needs.

The City of Thomasville is seeking a multidisciplinary consultant team to update its Comprehensive Plan in a manner that builds directly upon the vision, goals, and place-based framework established through the Thomasville: Blueprint 2028 document. The updated Plan should generally maintain that established direction unless changing conditions, subsequent planning efforts, or community input demonstrate that revisions are warranted. While the Blueprint provides a long-range vision for Thomasville, this update should establish a focused ten-year framework for implementation.

Scope

Review and Integration of Existing Plans

The consultant shall review Thomasville: Blueprint 2028, its subsequent updates, and other relevant City plans, studies, policies, and initiatives as the foundation for the Comprehensive Plan update.

Community Engagement

The consultant shall develop and implement a robust, inclusive, and highly interactive community engagement process throughout development of the Comprehensive Plan. The engagement strategy should include a combination of community visioning sessions, a community design charrette, stakeholder meetings, and other innovative engagement techniques that encourage broad participation and allow residents to actively participate in shaping planning concepts and recommendations.

Existing Conditions, Trends, and Emerging Issues

The consultant shall conduct a targeted assessment of existing conditions, recent trends, and emerging issues necessary to inform the Comprehensive Plan.

Future Development Framework, Character Areas, and Policy Update

The consultant shall review and update the character area framework, Future Development Map, and related policies established by the Blueprint Plan.

Implementation and Monitoring

The consultant shall develop a clear and realistic implementation program that translates the Comprehensive Plan into specific and measurable actions for the next ten years. [...] The updated plan shall include a newly created Capital Improvements Element (CIE).

Draft Plan, Review, and Adoption

The consultant shall prepare a complete draft Comprehensive Plan incorporating the findings, policies, recommendations, and implementation program developed through the planning process. The consultant shall support City staff through the formal review and adoption process, including presentation of the draft to the appropriate boards and elected officials, required public hearings, transmittal to the regional commission and Georgia Department of Community Affairs, response to agency comments, and completion of any revisions necessary to obtain DCA approval prior to final adoption.

UDO Policy Framework (Optional Task)

The City intends to prepare a new Unified Development Ordinance (UDO) following adoption of the Comprehensive Plan. This optional task would produce the policy and strategic framework that guides that effort. Respondents shall describe their approach to this task and provide a separate schedule and a separate line-item fee for it, apart from the base scope.

Project Schedule

The Comprehensive Plan must be ready for submittal to the regional commission and the Georgia Department of Community Affairs by March 15, 2028, to allow time for regional and state review. The City must adopt the Plan no later than June 30, 2028, which is a firm deadline.

Final Products

  • A final, DCA-approved and City-adopted Comprehensive Plan, including all required elements, maps, policies, and supporting materials.
  • All final maps, GIS data, technical analyses, appendices, presentation materials, and supporting documentation produced as part of the project.
  • Publication-ready PDF files and editable native files for all major deliverables so the City can maintain and update the Plan over time.

Additional information

Submission

Sealed proposals will be received until **December 17, 2026, at 2:00 PM EST**, at the City of Thomasville Purchasing office, 111 Victoria Place, Thomasville, Georgia 31792, sent to the attention of Lori McCardle, Purchasing Administrator. Respondents must submit one (1) original hardcopy version WITHOUT pricing, one (1) digital copy on USB drive WITHOUT pricing, and one (1) separately sealed paper copy of the Proposal Project’s pricing/cost of the proposal. Proposals shall not exceed twenty (20) pages total, including title or cover pages, appendices, and supplemental materials. The separate Cost Proposal is excluded from this page limit.

Questions

All questions shall be submitted by e-mail to Lori McCardle, Purchasing Administrator. Questions and the City’s responses will be posted as Addenda to this RFP on the City’s website.

Evaluation

Responsive proposals will be evaluated by a Selection Committee for a maximum total of 100 points:

  • Project Understanding: 15 points
  • Technical Approach and Community Engagement: 30 points
  • Team Qualifications and Relevant Experience: 20 points
  • Implementation and Quality of Comparable Work: 15 points
  • Project Management, Capacity, and Schedule: 10 points
  • Cost Proposal and level of effort: 10 points

The City anticipates inviting approximately three (3) highest-ranked firms from Phase I to participate in finalist interviews. Final selection will be based solely on the Phase II interviews.

Insurance

The City requires that the City of Thomasville, Georgia be listed on each of the insurance policies as "additional insureds". Comprehensive General Liability, Vehicle Liability, and Worker’s Compensation insurance are required.

Documents

1 file

Subscribe to get this document.

  • 2026_012 COMPREHENSIVE PLAN UPDATE.pdf
    Download

Similar open bids

In Georgia

More from City of Thomasville

Open bids