2027-001 Portsmouth Lift Station Wet Well Pipe Rehabilitation

Active PE-66241-NONST-2027-000000031 RFPConstruction - Heavy & CivilCity of Flowery Branch
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Flowery Branch (Georgia) posted this RFP on Nov 25, 2026. Responses are due Jan 26, 2027. Category: Construction - Heavy & Civil. Questions are due 2027-01-08 11:00. Solicitation number PE-66241-NONST-2027-000000031.

Solicitation details

General information

Solicitation number
PE-66241-NONST-2027-000000031
Notice type
RFP
Place of performance
Georgia
Questions due
2027-01-08 11:00

Agency and category

Agency
City of Flowery Branch
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Flowery Branch, Georgia (henceforth referred to as the “City”), is seeking proposals for the rehabilitation of an existing sanitary sewer lift station. The project includes the furnishing of all materials, equipment, labor, and services necessary for the installation of new infrastructure, including but not limited to piping, valves, concrete, epoxy and related appurtenances.

The City of Flowery Branch seeks qualified contractors to provide all labor, materials, equipment, supervision, startup assistance, testing, bypass pumping, rehabilitation materials, coatings, traffic control, and ancillary services necessary to rehabilitate the existing Portsmouth Lift Station wet well and associated discharge piping infrastructure. The Contractor shall furnish a complete and operational installation and shall maintain uninterrupted wastewater service throughout the duration of the project.

Scope

Overview

This project rehabilitates the existing Portsmouth sewage lift station. Work includes:

  • Bypass pumping
  • Draining the force main and cleaning out the station
  • Furnishing and installing new discharge valves and piping
  • Lining the interiors of the wet well, overflow manhole, and valve vault with epoxy

The station shall stay in service through bypass pumping for the full duration of the work. No sanitary sewer overflows will be allowed. [...]

Detailed Scope of Work

  • Furnish, install, operate, and maintain temporary bypass pumping that can convey all incoming flows for the full duration of construction. Include standby pumping capacity.
  • Drain the existing force main back into the wet well.
  • Vacuum out the wet well and overflow manhole.
  • Haul off all sewage, sludge, grit, and debris and dispose of it at an approved facility.
  • Remove and dispose of the two (2) existing 4-inch check valves. Furnish and install two (2) new 4-inch check valves.
  • Remove and dispose of the two (2) existing 4-inch plug (isolation) valves. Furnish and install two (2) new 4-inch plug valves.
  • Carefully remove, protect, and reinstall the existing 4-inch x 4-inch tee and valve on the bypass connection (red piping).
  • Remove and dispose of both existing pump base elbows. Furnish and install two (2) new base elbows.
  • Remove and dispose of both existing sets of 4-inch vertical discharge piping. Furnish and install two (2) new sets.
  • Remove and replace the upper 90-degree bend on each discharge line, which is embedded in the wet well wall. [...]
  • After all piping and valve work is complete, clean, prepare, and line all interior surfaces of the wet well, overflow manhole, and valve vault. [...]
  • Test all new valves and piping for leaks under normal operating pressure.
  • Restore the station to full operation and confirm with the Owner that it is operating properly.
  • Remove all temporary bypass equipment, then clean and restore the site.

Additional information

Submission

The Finance Department must receive the Respondent’s submission in a **sealed envelope** at 5410 Pine Street. Submissions must be clearly marked with the **required** Solicitation Label. Submit **one (1) original hard copy** and **one (1) electronic copy on a flash drive**. [...] Submissions may not be delivered by facsimile, other telecommunication methods, or solely by electronic means.

Site Visit

The **mandatory** pre-bid meeting is followed by a site visit to the lift station.

Evaluation

| Evaluation Category | Maximum Points |
| --- | --- |
| Experience and Qualifications | 10 |
| Technical Approach | 10 |
| Reliability, Safety, and Maintainability | 10 |
| Schedule and Responsiveness | 10 |
| Price and Overall Value | 60 |

Insurance

  • Workers’ Compensation: Statutory Minimum
  • General Liability: **$1,000,000/incident**, **$3,000,000 aggregate**
  • Architects and Engineers Professional Liability: **$2,000,000/incident**, **$2,000,000 aggregate**

Bonds

Bid, performance and payment bonds shall be **required** for all contracts where the cost is **$50,000.00** or greater. The bid bond must be not less than 5 percent of the total amount payable. Performance and payment bonds shall be at least the total amount payable.

Contract

The City anticipates executing a contract: A one-time contract for the wastewater lift station rehabilitation services. Solicitation shall remain valid for ninety days from the date of solicitation opening.