Atlanta Public Schools (Georgia) posted this RFP on Nov 23, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Questions are due 2026-12-04 14:00. Solicitation number 2027-0004.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Atlanta Independent School System is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services at Fifteen (15) Schools. The project includes facility upgrades and improvements at designated welcoming schools in support of Atlanta Public Schools' school consolidation and transition efforts.
The Atlanta Independent School System is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for facility upgrades and improvements at designated welcoming schools in support of Atlanta Public Schools' school consolidation and transition efforts. The intent is to ensure that receiving facilities are appropriately prepared to accommodate incoming students and staff by addressing identified facility needs, improving building conditions, and enhancing the functionality, safety, and overall learning environment.
The scope of work consists of site-specific improvements at the welcoming schools only, including building infrastructure, interior renovations, site improvements, furnishings, and other identified facility enhancements as outlined below. No work associated with the repurposing of vacated school facilities is included in this project. All construction activities and associated improvements under this scope shall be performed exclusively at the designated welcoming school locations.
Any other construction scope item deemed in the best interest of APS by the Capital Improvements Team at building name, that would upgrade, enhance, or alter any major building systems, including, but not limited to, electrical, HVAC, plumbing, finishes, roofing, site work, or any other alterations that could modify the layout of the building.
Stated Cost Limitation $3,089,615.00.00
The Construction Manager shall perform the pre-construction services set out in Article 3 of the *Construction Management at Risk Agreement*, including but not limited to the following: [...] The Construction Manager shall review project requirements, educational specifications, on- and off-site development, survey requirements, and preliminary budget, and make value engineering and constructability recommendations for revisions to APS in the form of a written report before final payment for this phase. [...] The Construction Manager shall prepare detailed cost estimates and recommendations for APS at the S.D. (Schematic Design), D.D. (Design Development), and C.D. (80% and 100% Construction Documents) phases of the project. [...] The Construction Manager shall prepare and issue the bid packages to cover the scope of the Work for this contract. [...] Upon completion of the design phase (e.g., when the construction documents are 80-100% complete) and bidding, the Construction Manager shall present to APS the GMP for APS's review and approval.
Proposals shall be submitted online** at https://aps.bonfirehub.com/opportunities/263497. The Office of Procurement Services will only accept proposals submitted online. Proposal submissions are due no later than **Tuesday, December 22, 2026. 11:00 a.m. ET.
Proposals must be submitted under the "Proposals" tab in Bonfire. Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
The initial contract will be a lump sum contract for the provision of pre-construction services. The lump sum fee for the pre-construction services is set out in the *Fee Sheet* attached in Bonfire. The construction management percentage for general conditions and the percentage of fees for the construction phase will also be included in the initial contract.
This project requires a General Contractor's license for the firm (Qualifying Agent, NOT Limited Tier).
All questions or requests for clarification must be sent via Bonfire under Message – Opportunity Q & A: https://aps.bonfirehub.com/opportunities/263497.
Attendance at the pre-proposal conference is not mandatory but is strongly encouraged.