City of Duluth (Georgia) posted this RFP on Nov 17, 2026. Responses are due Jan 27, 2027. Category: Utilities & Energy. Solicitation number PE-66750-NONST-2027-000000030.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Duluth will receive proposals from contractors for the following scope of work: Task I) Remove existing basement AHU and replace with new 15-ton AHU including necessary VAV Controls, dehumidification, economizer with powered exhaust, connect existing electrical and low voltage controls, integrate into the control system outlined in Task II. Task II) Replacement of HVAC Controls. The existing Carrier DDC controls (Carrier Control Network) for the Duluth City Hall have been found to be obsolete and failing from a mechanical standpoint. A new open-source BAS (Building Automation System) will be required to replace the existing Carrier CNN system.
THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING A NEW OPEN SOURCE BAS (BUILDING AUTOMATION SYSTEM) REPLACING THE EXISTING CARRIER CNN (CARRIER CONTROL NETWORK) SYSTEM.
EACH PIECE OF EQUIPMENT SPECIFIED SHALL BE PROVIDED WITH UPDATED CONTROLS. THIS INCLUDES ALL RTU'S (ROOFTOP UNITS) WITH BACNET AND UPC INTERFACE, NEW BACNET CONTROL INTERFACE FOR AHU-1 (AIR HANDLING UNIT) IN THE BASEMENT, AND NEW BACNET AND UPC INTERFACE FOR ALL TERMINAL AIR UNITS, AND START/STOP CONTROLS ON THE ROOF EXHAUST FAN.
THE NEW FRONT END MUST CONTAIN THE SAME INFORMATION AND FUNCTIONALITY AS THE EXISTING EQUIPMENT INCLUDING BUT NOT LIMITED TO: EQUIPMENT STATUS, MODE OF OPERATION, SETPOINTS, AIRFLOW, TEMPERATURES, OCCUPANCY, AND ALARMS.
THE ORIGINAL SEQUENCE OF OPERATION, INCLUDING INTERLOCKS, IS NOT AVAILABLE. CONTRACTOR MUST ANALYZE THE EXISTING SYSTEMS AND EACH ITEM'S CURRENT SEQUENCE OF OPERATION. PRIOR TO ANY DEMOLITION WORK, THE CONTRACTOR MUST SUBMIT A COMPLETE LIST OF ALL ITEMS AND THEIR SEQUENCES OF OPERATION. THIS APPROVED SUBMITTAL MUST BE USED DURING CONSTRUCTION AND INSTALLATION OF THE NEW CONTROL SYSTEM TO ENSURE ALL ITEMS OPERATE THE SAME AS EXISTING.
EXISTING DRAWINGS INDICATE THE BASELINE HVAC EQUIPMENT LOCATIONS, TYPES, AND QUANTITIES REQUIRING CONTROL UPGRADES. ALL OTHER GRAPHIC ELEMENTS, STRUCTURAL DETAILS, OR ARCHITECTURAL INFORMATION ON THESE DRAWINGS ARE FOR BACKGROUND REFERENCE ONLY AND ARE EXCLUDED FROM THIS SCOPE OF WORK.
NEW THERMOSTATS SHALL BE PROVIDED IN THE SAME LOCATION AS EXISTING UNLESS SPECIFICALLY NOTED TO BE RELOCATED.
INSTALL CONTROL WIRING IN CONDUIT. SEE DIVISION 26 FOR REQUIREMENTS.
COMPONENTS OF THE MECHANICAL SYSTEM FURNISHED UNDER THIS DIVISION OF THE SPECIFICATIONS MUST BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE THEREOF, EITHER FOR BENEFICIAL USE OR FINAL ACCEPTANCE, WHICHEVER IS EARLIER, AGAINST DEFECTIVE MATERIAL, DESIGN, AND WORKMANSHIP.
WARRANTY PERIOD: TWO YEAR(S) FROM DATE OF SUBSTANTIAL COMPLETION.
COMMUNICATIONS PROTOCOL MUST BE FULLY BACNET.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.