The Atlanta Regional Commission (ARC) is the regional planning and intergovernmental coordination agency for the metro Atlanta region. The ARC Office of Information Technology provides technology services to internal departments and partner agencies, with a focus on maintaining a secure, reliable, and highly available network infrastructure that protects the Agency’s data assets. The offices at 229 Peachtree Street NE, Suite 100 rely on a centralized UPS to maintain the server room and IDF closets during a loss of electrical power supply.
The existing unit is a Schneider Electric MGE Galaxy 5000, 40 kVA, with a 480 VAC three-phase input and output. Schneider discontinued the Galaxy 5000 line in July 2021, so parts and service support are limited. Therefore, ARC is requesting proposals to furnish, deliver, install, and commission one three-phase Uninterruptible Power Supply (UPS) to replace its existing unit, with the work complete by **December 31, 2026**.
The vendor shall provide a complete, turnkey replacement: equipment, freight, rigging, removal of the old system, installation, startup, and training.
Equipment requirements
Equivalent products from Schneider Electric (e.g., Galaxy series) or other manufacturers are acceptable if they meet every requirement above.
Services required
1. Site survey to verify existing conditions, conductors, breakers, and clearances before ordering.
2. Delivery, rigging, and placement of all equipment, from ARC's loading dock, including any freight elevator coordination with building management.
3. Disconnection, removal, and lawful disposal or recycling of the existing UPS and batteries; provide disposal certificates.
4. Electrical connections by a Georgia-licensed electrical contractor, with any required City of Atlanta permits and inspections.
5. Factory-authorized startup and commissioning, including load-bank or live-load test report.
6. Cutover performed after hours or on a weekend with a written plan approved by ARC to minimize downtime.
7. On-site training for ARC staff and delivery of as-built drawings, manuals, and warranty documents.
**Submission:** All proposals must be submitted electronically through the ARC procurement website as one combined file (PDF or Word). Proposals sent by email, mail, fax, or hand delivery will not be accepted. Vendors must register and be approved on the ARC procurement website portal before submitting.
Required forms
**Evaluation:** Price [30%], Schedule [30%], Technical compliance [30%], Qualifications [10%]. A guaranteed completion date of December 31, 2026 is a pass/fail requirement.
**Insurance:** commercial general liability $1,000,000 per occurrence / $2,000,000 aggregate, automobile liability $1,000,000, and workers' compensation at statutory limits.
Prices must be firm for [60] days.