RFQ for Airport Consulting Services ¿ Engineering Services

Active PE-66888-NONST-2027-000000007 RFQuArchitecture & EngineeringPeachtree City Airport Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Peachtree City Airport Authority (Georgia) posted this RFQu on Nov 18, 2026. Responses are due Dec 16, 2026. Category: Architecture & Engineering. Questions are due 2026-12-02 12:00. Solicitation number PE-66888-NONST-2027-000000007.

Solicitation details

General information

Solicitation number
PE-66888-NONST-2027-000000007
Notice type
RFQu
Place of performance
Georgia
Questions due
2026-12-02 12:00

Agency and category

Agency
Peachtree City Airport Authority
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Peachtree City Airport Authority invites Statements of Qualifications from qualified aviation consulting firms to provide professional on-call engineering, architectural, and construction inspection and administration services for Atlanta Regional Airport - Falcon Field. The Authority intends to select one consultant team under this RFQ and execute a separate Master Agreement for these services.

The anticipated Master Agreement term is five years from February 27, 2027, ending February 26, 2032. Assignments will be negotiated individually through written task orders. Some services may not be required; no minimum amount of work is guaranteed.

Scope

Services are limited to the engineering and architectural elements of the named projects in Attachment A. The consultant will provide the professional services needed to develop and administer the identified improvements; this RFQ does not award construction contracts.

Design and technical investigations

Provide topographic and engineering surveys, geotechnical investigations, pavement and drainage analyses, preliminary and final plans, specifications, estimates, safety and phasing plans, and permitting support for the identified runway, taxiway, apron, lighting, roadway, utility, fuel farm, fencing, obstruction removal, and tower improvements.

Bidding and construction services

Provide bid documents, bid assistance and recommendations, construction administration, qualified resident observation and inspection, materials testing coordination, payment and change order review, record drawings, grant closeout support, and commissioning coordination as applicable to each project.

Architectural and specialized services

Provide appropriately licensed architectural, structural, electrical, and other specialists for tower and facility elements within the listed projects. Identify capabilities for EMAS, MALSR and airfield electrical systems, fuel systems, and value engineering when warranted.

Coordination with planning and environmental services

Coordinate design data with the separately selected planning consultant. ALP planning, environmental alternatives analysis, and environmental decision documents remain under the planning agreement. Engineering support for land and easement acquisition is limited to surveys, legal descriptions, plats, and technical exhibits; appraisal, negotiation, and acquisition are not awarded through this engineering RFQ.

Additional information

Submission

Submit **four paper copies** in a sealed envelope or box to Hope Macaluso, A.A.E., Peachtree City Airport Authority, 7 Falcon Drive, Peachtree City, GA 30269. Clearly mark the package "Airport Engineering Architectural and Construction Services RFQ" and include the submitting firm's name. Late responses will not be considered. Do not include consultant fees, overhead rates, hourly rates, or other pricing in the SOQ or interview.

Scoring

Eligibility and responsiveness are evaluated first. Responsive SOQs will be scored on a 100-point scale using the following maximum points:

  • Comparable airport project experience: 25
  • Key personnel and technical qualifications: 25
  • Understanding and approach to the identified CIP work: 20
  • Capacity availability and schedule performance: 15
  • Past performance quality and cost control: 10
  • Service delivery and coordination capability: 5

Requirements

For State funding consideration, the responding team must demonstrate current GDOT prequalification covering Airport Design - Civil, Area Class 2.09(a); Airport Design - Electrical, Area Class 2.09(b); and Airport Construction Administration and Observation, Area Class 8.02.

Direct written questions and site visit requests only to Hope Macaluso, A.A.E., Aviation Director, at hope@kffc.org. Written answers affecting the RFQ will be issued to all interested firms by addendum.