I-25-2001 Tri-State Tollway (I-294) Bridge Construction 107th St to Illinois Rte 43 (Harlem Ave.)

Active 27-557THA-ENGCO-B-54761 RFIConstruction - Heavy & CivilIllinois Toll Highway Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Illinois Toll Highway Authority (Illinois) posted this RFI on Nov 9, 2026. Responses are due Dec 7, 2026. Category: Construction - Heavy & Civil. Solicitation number 27-557THA-ENGCO-B-54761.

Solicitation details

General information

Solicitation number
27-557THA-ENGCO-B-54761
Notice type
RFI
Place of performance
Illinois

Agency and category

Agency
Illinois Toll Highway Authority
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

Description

From the agency listing

Notice of Intent (NOI) for CM/GC Contract I-25-2001

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Illinois Tollway hereby informs industry via this Notice of Intent (NOI) of an upcoming Request for Qualifications (RFQ) solicitation associated with the “Project”. The Project is anticipated to be delivered under a Construction Manager / General Contractor (CM/GC) contract.

The intent of this NOI is solely to inform industry of the Project for prospective Proposers to start preparing for the upcoming CM/GC procurement.

Scope

The Project generally consists of reconstruction of multiple structures and associated roadway improvements along the Tri-State Tollway (I-294) between 107th Street and Illinois Route 43 (Harlem Avenue) in Cook County.

The following structures are included in this project:

  • I-294 over 107th Street (two structures)
  • I-294 over Norfolk Southern Railroad (two structures)
  • I-294 over Southwest Highway (two structures)
  • I-294 over Stony Creek (culvert)
  • I-294 over Illinois Route 43 (Harlem Avenue) (two structures)

Additional details will be provided in the *Request for Qualifications*.

Additional information

Procurement of a CM/GC Contractor will require a two-step, Best Value procurement, which includes the evaluation of a Request for Qualifications (RFQ) and a Request for Proposals (RFP), inclusive of a Technical Proposal and a Price Proposal. A stipend will not be offered for this procurement.

Estimated schedule

| Milestone | Date |
| --- | --- |
| Issue NOI | 11/6/2026 |
| Estimated release of RFQ | 12/7/2026 |
| Estimated SOQ Submission Due Date | 1/29/2027 |
| Estimated release of RFP | 3/15/2027 |

The project is anticipated to be a Category F with an estimated cost of **$150 to $200 million**.

The Illinois Tollway may make all parts of the Project worksite available to Proposers for visual inspection on a date to be determined and provided in the RFP.

The Proposer with the highest total combined score consisting of the Technical Proposal and Price Proposal will be designated as the Apparent Best Value Proposer. The Illinois Tollway reserves the right to reject any or all Proposals.