New Healthcare Facility at DOC

Active 2661-11031 RFSQConstruction - BuildingCook County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Cook County (Illinois) posted this RFSQ on Nov 25, 2026. Responses are due Jan 13, 2027. Category: Construction - Building. Solicitation number 2661-11031.

Solicitation details

General information

Solicitation number
2661-11031
Notice type
RFSQ
Place of performance
Illinois

Agency and category

Agency
Cook County
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This Construction Manager at Risk Agreement (this “Agreement”) for construction management and related services to provide pre-construction and construction services for A Healthcare Facility at the Department of Corrections [...] (the “Project”) [...] by and among the County of Cook, a body politic and corporate (the “Owner”) [...]

The Construction Manager shall be responsible for the construction of the Work consistent with the Owner’s Program and as set forth in and as reasonably inferable from the Contract Documents. The Owner’s Program may be modified by the Owner during the course of the Work.

Scope

The Construction Manager must perform everything required to be performed and provide all of the labor, necessary tools, machinery, materials, schedules and other documents and all facilities for the construction of the Project as described herein and other work necessary to perform and complete in a workmanlike manner, and within the specified time, all of the Work in strict accordance with the Contract Documents. [...]

Pre-Construction Phase

The Construction Manager shall provide the following Services:

  • Complete review and constructability analyses of the design and construction documentation as they exist at the Effective Date [...]
  • Consult with the Owner and the User Agency regarding the goals and requirements of the Project.
  • Review the requirements of any Governmental Authority with the Architect of Record, the Owner and the User Agency regarding costs and alternatives.
  • The Construction Manager shall develop and shall prepare and submit in writing for the Owner’s review and approval, procedures with regard to procurement, construction, project controls, project management, and safety for the duration of the Project (collectively, the “Project Procedures”). [...]
  • Schedule and conduct regular meetings with the Architect of Record, the Owner and the User Agency not less often than once each week. [...]
  • Prepare detailed value-engineering procedures and submit same to the Owner for review and approval. [...]
  • Prepare a Schedule for the Project utilizing the critical path method (CPM) in accordance with Article 10 of Book 2.
  • The Construction Manager shall develop and submit to the Owner a cost estimating model [...]
  • Prepare Preliminary GMPs for review by the Owner and the User Agency. [...]
  • Prepare a bidding strategy including bid packaging and permitting strategy for review and approval by the Owner and the User Agency. [...]
  • Coordinate and conduct pre-construction conferences with all bidders, as necessary, to review all contract requirements at a location designated by the Owner. [...]
  • The Construction Manager shall conduct early procurement activities, with prior Owner’s approval, if applicable. [...]

Additional information

Liquidated Damages

The liquidated damages for Work or Phase thereof not completed on the applicable Substantial Completion date are as described in Article 16.4 of this Agreement.

Economic Disclosure Statement

This *Economic Disclosure Statement and Execution Document* (“EDS”) is to be completed and executed by every Bidder on a County contract, every Proposer responding to a Request for Proposals, and every Respondent responding to a Request for Qualifications, and others as required by the Chief Procurement Officer. The execution of the EDS shall serve as the execution of a contract awarded by the County. [...]

The Applicant is **required** to keep all information provided in this EDS current and accurate. [...]

Effective October 1, 2016 all foreign corporations and LLCs must be registered with the Illinois Secretary of State's Office unless a statutory exemption applies to the applicant.

Documents

6 files

Subscribe to get these 6 documents.

  • EDS Form - Filllable Version (Updated Dec 2025).pdf
    Download
  • Exhibit 02 - Compensation and Fee Structure.xlsx
    Download
  • ISF - FORMS -.pdf
    Download
  • MBEWBE Forms 1 - 3 Complete Package Dec 2024.pdf
    Download
  • RFQ 2661-11031 CMAR for A New Healthcare Facility at the Department of Correction.pdf
    Download
  • Sample CMaR Agreement .pdf
    Download

Similar open bids

In Illinois

More from Cook County

Open bids