BL299 Willkie C – Replace Building Electrical Equipment – Prepurchase 15KV Transformers (IU #20251282)

Active PROCUREMENT-14DEB20E IFBUtilities & EnergyIndiana University
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Indiana University (Indiana) posted this IFB on Nov 12, 2026. Responses are due Nov 26, 2026. Category: Utilities & Energy. Solicitation number PROCUREMENT-14DEB20E.

Solicitation details

General information

Solicitation number
PROCUREMENT-14DEB20E
Notice type
IFB
Place of performance
Indiana

Agency and category

Agency
Indiana University
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Work of Project is defined by the Contract Documents and consists of the following:

  • Provide new two (2) 15KV substation style Transformers.
  • Shipping costs.
  • Warranty.

Owner: The Trustees of Indiana University, 2901 East Discovery Parkway, Bloomington, Indiana 47408.

Scope

Provide new two (2) 15KV substation style Transformers. Shipping costs. Warranty.

Electrical contractor is to accept delivery, inspect, unload, position and install electrical equipment that is to be furnished under this contract.

Vendor/Manufacturer shall protect equipment, load, secure and deliver to project site or a location within 50 miles of the project site as directed by the installing contractor.

The Vendor/Manufacturer shall not deliver equipment unless documented coordination, with the installing contractor, has occurred. The vendor/manufacturer will be responsible for ALL costs if the delivery has to be returned as a result of ineffective coordination with the installing contractor.

Manufacturers: Subject to compliance with requirements, provide products by one of the following:

  • Hitachi (ABB)
  • Eaton (Cooper Power Systems).
  • Square D; Schneider Electric.
  • No substitutions.

Transformer shall pass all Factory Acceptance Testing (FAT) prior to shipping. Vendor/Manufacturer shall provide reports to the Engineer and Owner prior to shipping equipment.

Additional information

**Bid date:** Bids will be received until **2:00 PM (local time) on December 10th, 2026**. Submit bids via electronically through **Buy IU**.

Provide one (1) electronic copy of the proposed transformer submittal with the bid.

Coordination with the installation contractor is required. Final delivery date shall be determined by the installing contractor.

The Vendor warrants that for **two years** after project substantial completion date, all goods or work supplied under this purchase order shall conform to specifications, drawings, or other descriptions contained or referenced herein and shall be of good quality and workmanship, and free from defects. Project substantial completion is estimated to be in June 2029.

The undersigned Bidder has informed himself of the tax-exempt status of the Owner, as set forth in the Special conditions, and therefore, has not included these taxes in his Lump Sum Base Bid price.

Documents

1 file

Subscribe to get this document.

Similar open bids

In Indiana

More from Indiana University

Open bids