Indianapolis Airport Authority (Indiana) posted this IFB on Nov 18, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Solicitation number I-26-016.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Electronic Bids (E-bids) will be received via PlanetBids (IAA’s solicitation management system) by the Indianapolis Airport Authority, for Building 2 – Primary Boiler Replacement; Project No. I-26-016 at the Indianapolis International Airport. All bids will be submitted electronically and read aloud on December 22, 2026, at 3:00 pm ET. No bids will be permitted after the designated time.
Each bid shall include all work, labor, equipment, and materials necessary to complete the project as required in strict compliance with the drawings and specifications (Plans) prepared by Argo Consulting Engineers, 309 West Washington Street, Indianapolis, Indiana 46204.
**Submission:** All bids will be submitted electronically via PlanetBids and read aloud on **December 22, 2026, at 3:00 pm ET**. To attend the bid opening on-line (virtual meeting), please contact PDAdmins@ind.com.
All bids shall be on *Form No. 96* as prescribed by the State Board of Accounts, must be accompanied by a Financial Statement, must be properly and completely executed, and shall be accompanied by a properly completed non-collusion affidavit. After opening bids, no bid shall be withdrawn for a period of sixty (60) calendar days without written consent from the Owner.
All bids shall be accompanied by a scanned copy of the bid bond in an amount of not less than **5%** of the contract amount. Original copy of the bid bond will be requested from the successful bidder immediately following the bid opening.
Contractors awarded a contract will be required to furnish acceptable surety bonds in the amount of **100%** of the contract price. Said performance, material and payment bond shall remain in effect for twelve (12) months after the date of the Owner's final acceptance of Contractor’s work.
In accordance with Indiana Code Section 5-16-13-1, et seq., prequalification with the Indiana Department of Administration (IDOA) or the Indiana Department of Transportation (INDOT) is **required** of all contractors, in any contractor tier, performing work under contract to the IAA which is estimated to be One Hundred Fifty Thousand Dollars ($150,000) or greater.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.