Iowa Communications Network (Iowa) posted this ITB on Nov 11, 2026. Responses are due Nov 23, 2026. Category: Construction - Heavy & Civil. Solicitation number 336-ITB26-032-3218-2027.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This is a City of Des Moines cable relocation project that will be managed by the ICN.
The Iowa Telecommunications and Technology Commission (ITTC) operating the Iowa Communications Network (ICN) will be receiving sealed bid proposals until **12:00 p.m. central time Monday, November 23, 2026** for:
ICN OSP Project # 77244807, Polk Co
This is a City of Des Moines cable relocation project that will be managed by the ICN. The Contractor shall supply 3” HDPE conduit, armored single-mode OSP fiber optic cable, Type 3 / Type 4 polymer concrete handholes, and all material necessary to place per ICN and City of Des Moines standards (per 77244807 – ENGINEERING PLANS). The cable must be Build America, Buy America Act (BABA) compliant which requires that all iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects are produced in the United States.
Splicing excluded from this construction bid / splicing shall be coordinated with NOC OSP.
ICN Responsibilities
City of Des Moines Responsibilities
Contractor Responsibilities
Sealed bid proposals must be received at ICN's office no later than **12:00 p.m. central time November 23, 2026**. This requirement is a **mandatory** requirement and is not a minor deficiency subject to waiver by the ICN. No bid proposals will be accepted after the date and time specified.
The bid proposals must be mailed or delivered to Sheri Stephens, Iowa Communications Network, Grimes State Office Building, 400 East 14th Street, Des Moines, IA 50319. The original bid proposal must be in a package CLEARLY MARKED ITB 26-032 on the outer envelope or wrapping.
ICN requires a breakdown of lump sum bids into labor and materials.
All bid proposals shall be firm for a period of ninety (90) days.
Work may begin upon award of the bid and completion of the contract. Not later than 3/31/2027, Due to tight ROW and other utilities relocation we would request the new HDPE work is completed prior to frost/winter.
No Vendor Conference. No Site Visit.
Subscribe to get these 6 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.