City of Muscatine (Iowa) posted this IFB on Nov 25, 2026. Responses are due Dec 17, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-11 14:00. Solicitation number 2026-0116.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Houser and Fulliam Mini Roundabout is located at the intersection of Houser Street and Fulliam Avenue. Construction primarily includes pavement removal, excavation, concrete paving, subdrains, granular sub-base, underground utility improvements, and sidewalk.
All streets are within corporate city limits of Muscatine, Iowa. Construction start date will be June 1, 2027. Work must be substantially completed by **July 30, 2027**.
Construction primarily includes pavement removal, excavation, concrete paving, subdrains, granular sub-base, underground utility improvements, and sidewalk.
General Notes
Estimate Reference Notes
Submission
A Bid shall be received no later than the date and time prescribed and at the place indicated in the Bid Invitation and shall be accompanied by any required documents. Bids received after the date and time prescribed for the opening of bids, or not submitted in the designated manner, will not be accepted and will be returned to the Bidder unopened.
**Only bids submitted to the City's IonWave bidding site will be considered.** Bids sent by mail, delivery system, faxed, hand-delivered, emailed or other electronic submittal means will not be considered.
The final step of the online bid submission is a digital signature certifying all entries and response attachments to be correct. The signature must be by the same individual who is the Company Owner or an authorized Officer of the Company. If an addendum which materially affects bid quantities is issued after your bid is submitted, your status will change from "Complete" to "Not Submitted". An addendum will not be issued less than 24 hours before the bid opening. The bidder is solely responsible for monitoring the status of their bid.
Required attachments
Subscribe to get these 9 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.