City of Clinton (Iowa) posted this RFP on Nov 11, 2026. Responses are due Dec 1, 2026. Category: Construction - Building. Questions are due 2026-11-20 09:00. Solicitation number K-2027, Phase I.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project includes the RACM Partial Demolition of Structure, 200 South 2nd Street.
This project involves the RACM partial demolition of the rear portion of the following structure according to the contract documents and specifications: 200 South 2nd Street.
The City will select the lowest responsible bidder for the lump sum bid listed in the Form of Proposal and award a single contract.
RACM demolition of the rear portion of the commercial building at 200 South 2nd Street. Follow the detailed site description and plan sheet.
The selected bidder must be licensed as an asbestos abatement contractor or a licensed asbestos abatement firm must be hired to manage and execute the demolition process and clean-up.
All debris must be treated as friable asbestos and disposed of as such in accordance with the State of Iowa and Federal regulations. Landfill tickets from the disposal site (i.e., copies of the disposal site invoices) for the demolition debris for this contract must be submitted to this office before payment will be made for the demolition.
It is the responsibility of the selected bidder on this project to give proper notification to the Iowa Department of Natural Resources of the day they intend to start demolition activities.
It is the responsibility of the selected bidder to notify the City Engineering Department at least two (2) weeks prior to beginning any demolition work. Inspections by City staff are to be expected during demolition work.
All demolition work must be fully complete on or before **January 29, 2027**, and all site work must be fully completed on or before **April 30, 2027**.
Submission
Electronic sealed bids must be filed before **2:00 p.m.** on the 1st day of December, 2026, at the following online bidding platform: https://cityofclintoniowa.ionwave.net. Paper bids will not be accepted.
Required attachments
EITHER upload a Surety2000 electronic bid bond OR deliver a physical and original hard copy of a bid bond to the Engineering Department at City Hall prior to the bid date/time.
Bonds and award
A bid bond in the amount of five percent (5%) of the bid amount is required. The successful Bidder must furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. The chosen bid will be awarded to the lowest responsive/responsible bidder.
Insurance
General Liability and Automobile Liability: $1,000,000 combined single limit, each occurrence and aggregate. Workmen's Compensation: statutory limits. The City of Clinton will need to be listed as additional insured.
Liquidated damages
Five Hundred dollars ($500.00) per day.