City of Wichita (Kansas) posted this IFB on Nov 19, 2026. Responses are due Dec 4, 2026. Category: Landscaping & Agriculture. Questions are due 2026-11-24 17:00. Solicitation number 260297.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Wichita is seeking bids from firm(s) for Tree Stump Removal for the Park and Recreation Department.
This Request for Bid is for the removal of specified stumps within the City of Wichita, identified by the Forestry Section of the Park and Recreation Division.
The bid price will include all debris removal and clean-up resulting from grinding the stump and surface roots to a minimum of 6” below grade (surface roots outside of ROW boundaries will not be considered a part of this contract), removing the stump chips to a minimum of 3” below grade and refilling the void with shredded topsoil leaving the topsoil tamped and mounded at 2-3 inches above grade to account for settling over time. [...] Clean-up and soil applications should result in a clean street and curb area, driveway, and sidewalk where applicable.
Before the start of work, a shared Excel file listing all the work locations sorted by Ortho’s will be made available to the Contractor. The Contractor shall determine the sequence of work; however, each Ortho must be completed in full (excluding work as a result of inspection) before progressing to the next adjacent Ortho, ensuring an efficient and continuous workflow.
The Contractor, when a work location is complete, will notify Forestry Staff by updating the shared Excel file by checking the “complete” box next to the location. This file should be updated every day that work is completed. An inspection of the completed work will commence within 24 hours of notification by the Contractor. [...] Only once the work location has passed inspection will the work be considered complete.
Progress billing will occur at the completion of an Ortho, including any rework identified by inspection.
The contractor will be responsible for the disposal of all debris associated with the removal of each stump. No debris is allowed to remain on a street, sidewalk, or pathway overnight. Open holes from stump grinding must be filled prior to leaving the site and are not permitted to remain open overnight as this represents a trip hazard and is unsafe for pedestrians.
Bid groups
All work associated with this contract is to be completed within **180 calendar days** from the time the City issues notice to proceed with the Contractor.
Bids are to be submitted through the City’s Procurement Portal (wichita.gov/procurementportal) using a secure login/password.
THE AWARD WILL BE BASED ON THE LOWEST AND BEST TOTAL NET BID PER GROUP.
Bids submitted may not be withdrawn for a period of 60 days following the opening of this Request for Bid.
Equipment intended to be used to execute this contract is subject to an inspection by the City of Wichita as a pre-qualification to bid. Jon Bacon, City Arborist or his designee will conduct the inspections. To schedule an inspection, email Jon Bacon at jbacon@wichita.gov or call the Park Superintendent office at 316-268-4620. Inspection may be virtual if needed.
Liquidated damages will be assessed at a rate of **$50.00** per incomplete location per day, past the specified 180 days.
Either party may cancel its obligations herein upon thirty-day (30) prior written notice to the other party.
Insurance required
The Certificate of Insurance must be submitted within ten (10) days after notification of award.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.