City of Bowling Green (Kentucky) posted this ITB on Nov 23, 2026. Responses are due Dec 11, 2026. Category: Construction - Heavy & Civil. Solicitation number 2027-14.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Bowling Green, KY is soliciting bids for the replacement of the sanitary sewer pump station at Lampkin Park, 938 Morgantown Road. The station serves the park restroom building and a connection for a portable restroom trailer, and discharges through an existing force main to a Bowling Green Municipal Utilities (BGMU) manhole.
The project will include demolition and disposal of the existing duplex pump station, and furnishing and installing a pre-packaged duplex grinder pump station rated 57 gpm at 30 feet TDH. The new station has a 48 inch diameter by 10 foot deep precast concrete wet well, a precast valve vault, explosion proof pumps and floats, and a NEMA 4X control panel with alarm and generator receptacle.
Work will consist of, but is not limited to, demolition, excavation, station installation, reconnection of existing sewer lines and force main, electrical service from the service pole to the control panel, security fencing, start-up and training, and restoration of disturbed areas. All work shall be completed in accordance with the project plans, the specifications, and the Kentucky Division of Water construction permit.
The contractor shall visit the site(s) prior to bidding to familiarize themselves with project requirements and existing conditions.
Shop drawings shall be submitted on all electrical materials and equipment for acceptance prior to purchase by the contractor.
All permits needed to legally perform the electrical work shall be obtained by the contractor prior to start of work. Cost of permitting is by the contractor.
At completion of the work, a certificate of compliance from the local AHJ over the electrical work shall be provided to the engineer and owner. Cost of electrical inspection is by the contractor.