27P-003 Motorola PON to Tellabs PON Migration

Active BPM059292 RFPTelecommunicationsHoward Community College
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Howard Community College (Maryland) posted this RFP on Nov 23, 2026. Responses are due Dec 4, 2026. Category: Telecommunications. Solicitation number BPM059292.

Solicitation details

General information

Solicitation number
BPM059292
Notice type
RFP
Place of performance
Maryland

Agency and category

Agency
Howard Community College
Category
002Telecommunications
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Board of Trustees of Howard Community College invites proposals from qualified Tellabs-certified or Tellabs-experienced integrators to replace the College's existing Motorola Passive Optical Network (PON) equipment with Tellabs equipment, including a redundant OLT architecture and IEEE 802.1X network access control integration.

The College is requesting proposals from qualified Tellabs-certified or Tellabs-experienced integrators to provide all necessary labor, project management, configuration, integration, testing, documentation, and migration services required to replace the College's existing Motorola Passive Optical Network (PON) equipment with the Tellabs equipment identified in the College-provided Bill of Materials (BOM), including IEEE 802.1X network access control on applicable interfaces.

Scope

Included in Scope

  • Installation of the Tellabs equipment identified in the College-provided BOM (Section 1.16).
  • Removal and disposal, or return to college inventory, of replaced Motorola office equipment as directed by the College.
  • Configuration of Tellabs OLTs and Optical Network Terminals (ONTs).
  • Migration of voice, data, multicast, and applicable network access control services.
  • Configuration and integration of IEEE 802.1X on applicable Tellabs interfaces.
  • Validation of voice, data, multicast, 802.1X authentication, and network services.
  • Project management, cutover support, testing, acceptance, and as-built documentation.
  • Replacement of existing 1x32 optical splitters with 2x32 optical splitters to support a redundant Tellabs OLT architecture.
  • All splitter installation, fiber terminations, patching, labeling, and testing required to support the new splitter configuration.
  • Installation of Tellabs OLT equipment in the same physical locations currently occupied by the Motorola OLT equipment unless otherwise approved by the College.

Not Included in Scope

The following infrastructure is expected to remain in service unless specifically identified by the Offeror in its Exception Report as requiring work:

  • Existing outside plant fiber.
  • Existing underground conduit systems and fiber pathways.
  • Existing building entrance facilities, fiber distribution cabling, and fiber backbone infrastructure.
  • Existing telecommunications racks, cabinets, and power infrastructure where adequate capacity exists.

Each proposal shall include a written Exception Report identifying any condition requiring additional materials, labor, services, or infrastructure.

Additional information

All sealed proposals **MUST BE RECEIVED** via Equity Hub's Bid Locker at https://bidlocker.us/details/6573_Motorola_Pon_To_Tellabs_Pon_Migration by **11:00 a.m. local time**. No proposal will be accepted after the date and time stated.

A **mandatory** pre-proposal conference and site walk will be held. Failure to attend may result in the proposal being deemed non-responsive.

Contract Type: Firm Fixed Price.

Contract Duration: From Notice to Proceed through written final acceptance, followed by a minimum one (1) year workmanship warranty.

MBE Subcontracting Goal: Twenty-nine percent not mandatory but strongly encouraged.

The Board of Trustees of Howard Community College reserves the right to reject any and all proposals and to waive any formalities, informalities, or technicalities as it deems necessary, appropriate and in the College's best interests. Final award of the contract is subject to the availability of funding for this project.

Documents

1 file

Subscribe to get this document.

  • 27P-003_Motorola_PON_to_Tellabs_PON_Migration_RFP_Final.pdf
    Download

Similar open bids

In Maryland

More from Howard Community College

Open bids