Howard Community College (Maryland) posted this RFP on Nov 23, 2026. Responses are due Dec 4, 2026. Category: Telecommunications. Solicitation number BPM059292.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Board of Trustees of Howard Community College invites proposals from qualified Tellabs-certified or Tellabs-experienced integrators to replace the College's existing Motorola Passive Optical Network (PON) equipment with Tellabs equipment, including a redundant OLT architecture and IEEE 802.1X network access control integration.
The College is requesting proposals from qualified Tellabs-certified or Tellabs-experienced integrators to provide all necessary labor, project management, configuration, integration, testing, documentation, and migration services required to replace the College's existing Motorola Passive Optical Network (PON) equipment with the Tellabs equipment identified in the College-provided Bill of Materials (BOM), including IEEE 802.1X network access control on applicable interfaces.
Included in Scope
Not Included in Scope
The following infrastructure is expected to remain in service unless specifically identified by the Offeror in its Exception Report as requiring work:
Each proposal shall include a written Exception Report identifying any condition requiring additional materials, labor, services, or infrastructure.
All sealed proposals **MUST BE RECEIVED** via Equity Hub's Bid Locker at https://bidlocker.us/details/6573_Motorola_Pon_To_Tellabs_Pon_Migration by **11:00 a.m. local time**. No proposal will be accepted after the date and time stated.
A **mandatory** pre-proposal conference and site walk will be held. Failure to attend may result in the proposal being deemed non-responsive.
Contract Type: Firm Fixed Price.
Contract Duration: From Notice to Proceed through written final acceptance, followed by a minimum one (1) year workmanship warranty.
MBE Subcontracting Goal: Twenty-nine percent not mandatory but strongly encouraged.
The Board of Trustees of Howard Community College reserves the right to reject any and all proposals and to waive any formalities, informalities, or technicalities as it deems necessary, appropriate and in the College's best interests. Final award of the contract is subject to the availability of funding for this project.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.