Town of Oxford (Maryland) posted this IFB on Nov 16, 2026. Responses are due Dec 4, 2026. Category: Utilities & Energy. Solicitation number BPM059767.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of Oxford is seeking proposals for the rehabilization of the Towns water system alarms.
Town of Oxford SCADA Rehabilitation which includes, but is not limited to, the construction of the following: the installation of new level sensors in the existing water storage tanks at Tilghman Street and JL Thompson Drive, the updating of the Town’s existing SCADA software, and the connecting of water signals into the Town’s SCADA system.
Work includes all labor, materials, equipment, services, and documentation necessary to construct the Project defined herein. The Work may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents.
The Project is generally described as follows: Town of Oxford SCADA Rehabilitation which includes, but is not limited to, the construction of the following: the installation of new level sensors in the existing water storage tanks at Tilghman Street and JL Thompson Drive, the updating of the Town’s existing SCADA software, and the connecting of water signals into the Town’s SCADA system.
The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located at the existing Town Maintenance Building and water storage tank at 103 JL Thompson Drive and at the water storage tank and control building at 339 Tilghman Road.
Pay items
| Item No. | Description | Unit | Estimated Quantity |
| --- | --- | --- | --- |
| 101 | Mobilization | LS | 1 |
| 102 | Software Update | LS | 1 |
| 103 | System Installation | LS | 1 |
The Work will be substantially completed within **240 days** after the Effective Date of the Contract and completed and ready for final payment within **270 days** after the Effective Date of the Contract.
Contractor shall pay Owner **$1,000.00** for each day that expires after the Contract Time for substantial completion.
Before starting Work, Contractor shall furnish a **performance bond** and a **payment bond**. Each bond shall be in an amount equal to the Contract Price. The Performance and Payment bond forms to be used on this Project are EJCDC C-610 and C-615 respectively.
Before starting Work, Contractor shall furnish evidence of insurance from companies that are duly licensed or authorized in the jurisdiction in which the Project is located with a minimum AM Best rating of A-VII or better.