27-05 Replacement of Duplex Sewerage Ejector System

Active BD-27-1373-1373C-1373L-135205 IFBConstruction - BuildingCape Cod Community College
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Cape Cod Community College (Massachusetts) posted this IFB on Nov 6, 2026. Responses are due Dec 7, 2026. Category: Construction - Building. Questions are due 2026-11-25 11:00. Solicitation number BD-27-1373-1373C-1373L-135205.

Solicitation details

General information

Solicitation number
BD-27-1373-1373C-1373L-135205
Notice type
IFB
Place of performance
Massachusetts
Questions due
2026-11-25 11:00

Agency and category

Agency
Cape Cod Community College
Category
005Construction - Building
Source listing
Link with a plan

Description

From the agency listing

Please see the attached IFB document for all details.

Email all questions to procurement@capecod.edu noting IFB 27-05 Replacement of Duplex Sewerage Ejector

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Cape Cod Community College ("CCCC" or the "College"), an agency of the Commonwealth of Massachusetts, invites qualified and properly licensed contractors to submit proposals for the replacement of an existing Duplex Sewerage Ejector for the Tilden Arts Building at the main West Barnstable campus.

Scope

Project Objectives

  • Replace existing duplex sewerage ejector system, associated piping, and all electrical controls.
  • Work should be performed during school winter break (12/26/2026 to 12/30/2026) or off hours to not disrupt daily operations.
  • Reduce unplanned downtime.
  • Provide work plans for the domestic water and sanitary system shutdown of the Tilden Arts Building.

The successful contractor will be responsible for the complete removal of the outdated system, installation of a new, efficient, and compliant duplex sewerage ejector pump system and all electrical wiring to both pumps and motor controls. Ensure that all work is completed in accordance with local building codes and regulations.

A duplex VSA-6H suspended wet-pit sewage pump unit as manufactured by Federal Pump Corp or simulator. Each pump shall be rated 325 G.P.M. at 40 feet Total Dynamic Head, shall have a 4" inch discharge and be built for a pit or basin 10 Feet deep. [...] Motors shall be 2 HP, 3 phase, 480 volts, 1750 R.P.M. open, drip-proof ball bearing type. Furnish a pedestal mounted alternating float switch to alternate the operation of the pumps and provide simultaneous operation when required. Furnish a pedestal mounted auxiliary float switch to turn on both pumps if the alternating float switch is inoperative. [...] Supply an extra set of dry electrical contacts for future external alarm capability.

General Services

The contractor is responsible for the safe disconnect, demolition, and disposal of all electrical, plumbing, and other structures to be removed for the installation of the new system. The contractor is required to clean up their worksites and disposal of work-related trash at the end of their shift each day. Trash can be disposed of onsite at the facilities building dumpster. The contractor shall furnish all labor, supervision, tools, diagnostic equipment, transportation, materials, consumables, and incidental services necessary to work in a professional manner.

Additional information

**Submission method:** All completed required forms must be in a PDF format and emailed to procurement@capecod.edu noting "IFB 27-05 Replacement of Duplex Sewerage Ejector." in the email's subject line before the IFB's deadline. No late or faxed submissions will be accepted. No incomplete proposals will be considered.

Bids must be submitted on the forms supplied by the College for receipt NO LATER THAN Monday, December 7th, 2026, by 11:00 am.

Required forms

1. Vendor/Bidder Information Sheet – Attachment A
2. Certificate of Compliance – Attachment B
3. Certification of Non-collusion – Attachment C
4. Debarment and Suspension – Attachment D
5. Price Proposal Form – Attachment E

The College shall award this contract to the responsive and responsible respondent offering the lowest price for the products requested in accordance with the specifications of this IFB.

Prices quoted must be available for acceptance for at least ninety (90) days after the proposal's opening date unless otherwise noted in your proposal.

This contract is required to be paid at the prevailing rate. The contract's anticipated start date is December 26, 2026. Contractor is required to be onsite.

Site walkthrough (meet at Tilden Arts Center Building #1 outside at the front door): November 20th, 2026, at 8:00am.

Documents

1 file

Subscribe to get this document.

  • IFB 27-05 Sewage Pump Tilden Arts Final.pdf
    Download

Similar open bids

In Massachusetts

More from Cape Cod Community College

Open bids