Department of Transportation (Massachusetts) posted this RFQu on Nov 16, 2026. Responses are due Dec 29, 2026. Category: Construction - Heavy & Civil. Solicitation number BD-27-1030-0H100-0H002-135450.

Solicitation details

General information

Solicitation number
BD-27-1030-0H100-0H002-135450
Notice type
RFQu
Place of performance
Massachusetts

Agency and category

Agency
Department of Transportation
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

Description

From the agency listing

The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for the Design-Build Project consisting of the completion of the design and construction for:

SPRINGFIELD- 3 Bridge Replacements, S-24-017, St. James Avenue over CSX, S-24-070, Tapley Street over I-291 and CSX, S-24-071, St. James Avenue over I-291 Design-Build (612167)

The Project is located in Springfield within MassDOT District 2 (Hampden County). [...] The proposed Project cost is estimated at **$226,000,000.00**. The Best Value Design-Build Procurement process shall be used for the Project as authorized under MGL c 149A ss 14 et seq.

Scope

It is to be understood that the Project scope includes all aspects of design, demolition, and construction, compliance with all environmental permits to be secured and/or amended by final design, coordination with utilities, public outreach, and any coordination with abutting or interested parties.

The scope of work includes, but is not limited to, the replacement of three existing bridge structures that carry St. James Avenue (Bridge No. S-24-017 and S-24-071) and Tapley Street (Bridge No. S-24-070) over I-291/US-20 and CSX Railroad, the removal of bridge structure (S-24-072) that carries the existing I-291 Eastbound offramp to Page Boulevard, the reconfiguration of the St. James Avenue / Page Boulevard / I-291 interchange, the reconstruction of the intersection of St. James Avenue and Page Boulevard into a multi-lane roundabout, and various bicycle / pedestrian improvements throughout the Project. The Project includes construction of 1,700-feet of noise barrier along I-291 Westbound, replacement of the existing ITS camera on I-291, street lighting along St. James Avenue, roadway reconstruction, highway drainage/storm water management facilities, traffic management, pavement markings and signage, utility relocation/protection and all other related bridge and highway work.

MassDOT will use staged construction to complete the major work elements within the project limits. Three lanes of travel will be maintained on I-291 during peak traffic periods, vehicle access through the work zone will be maintained at all times and the interchange ramps will remain open during peak travel periods.

The new bridge structures will provide a minimum 75-year design life.

Bridge S-24-071 carrying St. James Avenue over I-291 will be replaced with two (2) independent bridge structures to carry northbound and southbound traffic respectively as part of the interchange configuration. [...] The Project includes construction of several retaining walls to support the reconfigured ramps and multiple temporary walls to support the proposed temporary traffic configuration during construction.

The Project includes temporary and permanent stormwater management facilities including the design and construction of a stormwater control measure (SCM).

Additional information

**Submission:** The deadline for receipt of Letters of Interest is **December 29, 2026 at 12:00 PM (noon)**. All parties must send a "Letter of Interest" to MassDOTBIDDocuments@dot.state.ma.us. Letters of Interest **MUST** include a contact name, address, telephone number, and email address. Late submittals will not be accepted. The Statement of Qualifications (SOQ) will be due on or around **February 2, 2027** by noon (12:00 PM).

MassDOT will use Bid Express for this Project. All bidders shall use Bid Express for submittal of bids.

**Prequalification (required):** All Design-Builders must have a Major Participant that is prequalified by the MassDOT Architects and Engineers Review Board in the areas of:

  • Complex Bridge Design and Rating
  • Complex Roadway Design

In addition, all Design-Builders must have a Major Participant who is prequalified by the MassDOT Prequalification Committee in Bridge - Construction with a Single Contract Limit (SCL) of at least **$226,000,000.00**.

**Evaluation:** This Design-Build procurement will follow a two-phase Best Value selection process. Proposers (and/or their key personnel) will be evaluated on criteria including similar type of work experience for Bridge and Highway reconstruction, Design-Build experience, quality of performance on prior projects, experience of Key Personnel, financial status, safety record, and risk management.

**Bonding:** The Proposer must be able to produce evidence of 100% bonding capacity.

**Contract term:** MassDOT will require that all construction must be completed within 2,000 calendar days of Notice to Proceed.