City of Brockton (Massachusetts) posted this ITB on Nov 25, 2026. Responses are due Dec 17, 2026. Category: Parks & Recreation. Solicitation number BD-27-1143-PRO15-PRO15-135741.
Synthetic Soccer Field Installation Bid documents shall be made available at www.projectdog.com. Tutorials and instructions for Project #262849 are available online at www.projectdog.com
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Brockton, Massachusetts, acting as the Awarding Authority, invites sealed bids for the Installation of a Synthetic Soccer Field located on Centre St, Brockton, MA 02301, in accordance with Bid Documents prepared by J.K. Holmgren Engineering LLC, 1024 Pearl St., Brockton, MA 02301.
All bids for this Project are subject to the provisions of Massachusetts General Laws, M.G.L. Chapter 30, Section 39M, as amended.
The work of this contract includes, but is not limited to, the installation of a new synthetic turf system.
The work of this contract includes, but is not limited to, the installation of a new synthetic turf system.
The project shall commence as early as Dec 26, 2026 and shall be substantially complete on **Friday, May 14, 2027 at 5:00 PM**.
This project is being Electronically Bid (E-Bid). **All bids shall be submitted online at www.Projectdog.com**. Hard copy bids will not be accepted by the City of Brockton. For assistance, contact Projectdog Inc. at 978.499.9014.
Bidders and the public may view bid results, as well as inspect bid documents via the Projectdog website or attend an in person Bid opening in the GAR Room 2nd Floor, City Hall, 45 School St, Brockton, MA 02301.
Each Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of **five percent** of the Bid.
Bidders may not withdraw their Bids for a period of thirty days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the Bids.
The Successful Bidder must furnish a **100 percent Performance Bond** and a **100 percent Payment Bond** with a surety company acceptable to the Owner.
Wage rates for this Project are subject to the minimum wage rates as per M.G.L., Chapter 149, Section 26 to 27H inclusive. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. [...] Where rates differ, the higher rate shall be considered as the minimum rate.