MassDOT Berkshire Line Track Improvements Phase V: Lee, lenoxand Pittsfield

Active BD-27-1030-0T100-0T100-135249 IFBConstruction - Heavy & CivilDepartment of Transportation
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Department of Transportation (Massachusetts) posted this IFB on Nov 9, 2026. Responses are due Dec 10, 2026. Category: Construction - Heavy & Civil. Solicitation number BD-27-1030-0T100-0T100-135249.

Solicitation details

General information

Solicitation number
BD-27-1030-0T100-0T100-135249
Notice type
IFB
Place of performance
Massachusetts

Agency and category

Agency
Department of Transportation
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

Description

From the agency listing

install approximately 10.7 track miles of 136RE continuous welded rail (CWR) from approximately MP 72 to MP 86. In addition, this contract includes, but is not limited to, the installation of three (3) new turnouts, replacement of fifive (5) private/farm crossings, surfacing and aligning of approximately eleven point seven (11.7) miles of track, replace up to 1,700 timber crossties and approximately one point five (1.5)miles of full-depth track construction.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The major work to be completed in this contract is to install approximately 10.7 track miles of 136RE continuous welded rail (CWR) from approximately MP 72 to MP 86. In addition, this contract includes, but is not limited to, the installation of three (3) new turnouts, replacement of five (5) private/farm crossings, surfacing and aligning of approximately eleven point seven (11.7) miles of track, replace up to 1,700 timber crossties and approximately one point five (1.5) miles of full-depth track construction.

Work also includes installation of new bridge timbers on Bridges 72.45, 75.49, 77.28, 80.72, 85.52 and 85.88, cleaning and application of corrosion protection on top flanges of steel members prior to new timber installation, anchorage repairs at Bridges 75.49, 77.71, and 85.88, installation of new walkway on Bridges 75.49, 77.28, 80.72 and 85.88.

Scope

The major work to be completed in this contract is to install approximately 10.7 track miles of 136RE continuous welded rail (CWR) from approximately MP 72 to MP 86. In addition, this contract includes, but is not limited to, the installation of three (3) new turnouts, replacement of five (5) private/farm crossings, surfacing and aligning of approximately eleven point seven (11.7) miles of track, replace up to 1,700 timber crossties and approximately one point five (1.5) miles of full-depth track construction.

Work also includes installation of new bridge timbers on Bridges 72.45, 75.49, 77.28, 80.72, 85.52 and 85.88, cleaning and application of corrosion protection on top flanges of steel members prior to new timber installation, anchorage repairs at Bridges 75.49, 77.71, and 85.88, installation of new walkway on Bridges 75.49, 77.28, 80.72 and 85.88.

Additional information

Electronic proposals for the following project will be received through the internet on www.commbuys.com ("COMMBUYS") until the date and time stated below. No paper copies of bids will be accepted. [...] Bidders must be registered with COMMBUYS in order to bid on this project.

**Bidders must be prequalified to bid on the project.** [...] Bidders must be pre-qualified under MBTA Class 1 – General Transit Construction (>$10,000,000 for Maximum Single Project Rating), MBTA Class 3 – Trackage (>$10,000,000 for Maximum Single Project Rating) to bid on the project. [...] Bidders must be prequalified in the following classes of work: General Rail Construction on or Around Active Rail Lines, Track Work and Bridge Construction.

All bids shall be accompanied by a bid deposit in the amount of **5% of the value of the bid**.

This project is subject to the schedule of prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development, and the Division of Occupational Safety.

The Project has an M/WBE participation goal of 4 % for the work performed under this contract.

Contractors are required to submit their approved Drug and Alcohol Testing Program along with their bids.

Documents

2 files

Subscribe to get these 2 documents.

  • BERKSHIRE LINE-616573-137063 Plans~1.pdf
    Download
  • BERKSHIRE LINE-616573-137063_CDSP~1.pdf
    Download

Similar open bids

In Massachusetts

More from Department of Transportation

Open bids