Town of Shutesbury (Massachusetts) posted this RFQu on Nov 13, 2026. Responses are due Dec 11, 2026. Category: Architecture & Engineering. Questions are due 2026-12-04 16:00. Solicitation number BD-27-1325-TOSHB-TOSH2-135363.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of Shutesbury (“Shutesbury” or the “Town”) is releasing this Request For Qualifications (“RFQ”) for a detailed decarbonization and electrification assessment for the Shutesbury Elementary School (SES). This assessment shall result in detailed data that can enable the Town to determine a final set of decarbonization/electrification plans for the school. This data must be usable in the subsequent creation of design documents to serve as the basis for application for a Massachusetts Decarbonization Accelerator Grant.
The Town will be funding the work of the successful Applicant using a Massachusetts Climate Leader Community Technical Assistance Grant.
The school is located at 23 West Pelham Rd in Shutesbury, MA. SES is 34,886 square feet and was originally constructed in the 1970’s with a significant addition in 1994. [...] The entire facility is heated by two oil fired hot water boilers with distribution achieved through forced air duct heating from the Air Handling Units, hydronic unit ventilators, and hydronic baseboard radiators.
The purpose of this RFQ is to select one Professional Engineering Firm that can provide the best set of appropriate, comprehensive, effective and cost-effective decarbonization and electrification solutions for SES that will eliminate on-site fossil fuel use by 2050.
Assessment of Elementary Based Prior Assessments
The selected Professional Engineering Firm will review Shutesbury’s Decarbonization Roadmap, Comprehensive Building Assessment, MassSave Audit, Trane assessment and Brightcore assessment, and Climate Leaders Municipal Decarbonization Commitment and Roadmap Guidance. These documents will serve as the foundation of the more detailed assessment and the identified options. The final successful Applicant may explore and suggest additional technologies and deployment strategies for decarbonization/electrification that are not included in prior assessments.
Recommendations of Prioritized Options
The selected Professional Engineering Firm will present prioritized options to the Town based on the following factors:
The selected Professional Engineering Firm may also present additional factors that may be considered by the Town’s selection committee.
Final Plan
Following the review of options, the Town will identify its preferred decarbonization/electrification plan. The Applicant will provide details of this final plan that can be used in the Town’s application for a Decarbonization Accelerator Grant, and in developing all future necessary design documents for construction.
While not detailed in these documents, the Town is also seeking actionable recommendations regarding the installation of solar canopies in the SES; the location to be determined based on applicant’s recommendations.
Submission
Send your Statement of Qualifications (SOQ) to Hayley Bolton, Shutesbury Town Hall, P. O. Box 276, 1 Cooleyville Rd., Shutesbury MA 01072-0276, ATTN: RFQ #26-01. The qualification packages must arrive at the Shutesbury Town Hall on or before **3 p.m. on Dec. 18, 2026** to be considered. SOQs must be in a **sealed envelope**. Applicants must submit **two (2) hard copies and one (1) electronic copy in PDF format on a flash drive**.
Delivery may be in-person and hand-delivered to the Town Administrator only, or by certified mail.
Questions
All questions must be submitted in writing via email and must be received by **4 p.m., Dec. 4, 2026**.
Selection
For each of the criteria, Applicants will be rated as Strong (3), Proficient (2), Adequate (1) or Not acceptable (0). The Review Committee will select the highest-ranked submittals, a minimum of three applicants. At the Review Committee’s discretion, prospective Applicants may be requested to participate in an interview.
Timeline