Town of Harwich (Massachusetts) posted this IFB on Nov 25, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Solicitation number BD-26-1535-TOHAR-TADMI-135745.
The project consists of exterior restoration of the historic 1844 museum building and accessibility upgrades, including a new exterior ADA ramp and a limited-use/limited-application lift; historic wood window and door restoration; siding, trim, and portico column repairs; painting; and mechanical, electrical, plumbing, fire protection, and fire alarm upgrades. The estimated construction cost is **$1,650,000**.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The project consists of exterior restoration of the historic 1844 museum building and accessibility upgrades, including a new exterior ADA ramp and a limited-use/limited-application lift; historic wood window and door restoration; siding, trim, and portico column repairs; painting; and mechanical, electrical, plumbing, fire protection, and fire alarm upgrades. The estimated construction cost is **$1,650,000**.
The project consists of exterior restoration of the historic 1844 museum building and accessibility upgrades, including a new exterior ADA ramp and a limited-use/limited-application lift; historic wood window and door restoration; siding, trim, and portico column repairs; painting; and mechanical, electrical, plumbing, fire protection, and fire alarm upgrades.