Massachusetts Veterans' Home at Chelsea (Massachusetts) posted this RFQ on Nov 25, 2026. Responses are due Dec 4, 2026. Category: Facilities & Janitorial. Questions are due 2026-11-30. Solicitation number BD-27-1368-CHE01-CHE01-135642.
Provide scheduled preventive maintenance for the domestic cold-water pressure-reducing / zone-valve assemblies and the Armstrong triplex variable-frequency-drive (VFD) domestic-water booster system serving the Community Living Center at the Soldiers' Home in Chelsea.
Work shall include inspection, cleaning, exercising, testing, adjustment, recording of operating data, and written reporting.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Provide scheduled preventive maintenance for the domestic cold-water pressure-reducing / zone-valve assemblies and the Armstrong triplex variable-frequency-drive (VFD) domestic-water booster system serving the Community Living Center at the Soldiers' Home in Chelsea. Work shall include inspection, cleaning, exercising, testing, adjustment, recording of operating data, and written reporting.
This specification is written on a vendor-neutral basis so qualified firms can quote the same preventive-maintenance scope. The successful vendor shall furnish all labor, supervision, routine service tools, test instruments, and documentation necessary to complete the work described below.
Zone Valve / PRV Preventive Maintenance
- Check and record all available pressure gauges before and after service.
- Inspect and clean strainers.
- Disassemble as required and clean the zone-valve / PRV body.
- Inspect and clean control-restriction devices (CRDs), pilots, and related control components where applicable.
- Inspect diaphragms, fasteners, seals, trim, and internal components for wear, looseness, damage, or deterioration.
[...]
- Reassemble, place equipment back in service, and adjust pressure settings to the facility-approved operating setpoint.
- Verify stable operation and check for leakage after service.
- Identify any parts or rebuild work required. No non-routine repair or replacement shall be performed without prior written authorization.
Booster Pump Preventive Maintenance
- Check pump shutoff / operating pressure using available test points and verify proper pump performance.
- Check and record system pressure, suction pressure, and other available pressure readings.
- Verify proper pump rotation and inspect for water leakage, seal leakage, unusual noise, and vibration.
[...]
- Test alarms and panel indicator lights where applicable.
- Check system sequencing, lead/lag operation, and flow-sensing devices.
- Check hydrotank / accumulator precharge and operation. Drain/isolate as necessary to obtain an accurate precharge reading.
- Exercise pump isolation valves.
- Record hour-meter readings for each pump.
[...]
- Measure and record phase-to-phase voltage and current draw for each pump/motor while operating. Note any imbalance or readings outside manufacturer limits.
- Lubricate equipment in accordance with manufacturer recommendations where applicable.
- Return the complete booster system to normal automatic operation after testing.
Service Report / Deliverables
**Contract Term:** December 7, 2027-December 31, 2027