City of Detroit (Michigan) posted this RFP on Nov 25, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Questions are due 2026-12-18. Solicitation number 550671.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Detroit Office of Contracting and Procurement (OCP) on behalf of Constructing and Demolition department requests proposals from qualified Respondents to render certain technical or professional services ("Services") as set forth in this RFP to provide installation and full replacement of the compressed air system at Russell Gerry Garage located at 5800 Russell Street, Detroit, MI 48211.
The Russell Ferry Garages facility supports the City of Detroit's vehicle maintenance and fleet service operations under the General Services Department. The building houses garage bays and service areas that rely on a centralized compressed air system to support daily maintenance work.
Currently, the air compressor at Russell Ferry is only producing 100 ft-lbs. of torque, compared to the required 500 ft-lbs. This reduced capacity is slowing Fleet Services operations, as staff are forced to perform tasks manually. Replacing the air compressor would improve operational efficiency and significantly reduce the risk of injury. The air compressor is critical for operating tools, installing tires, and performing cleaning tasks.
The selected contractor (Awardee) will be responsible for all aspects of this project as defined in the Scope of Work. The selected awardee will be required to manage the existing air compressor assessment, engineering, and execution of required works to achieve project goals. [...] Tasks for this project will be divided into two phases (I) Design and Preconstruction Phase; and (II) Construction phase.
Phase 1 - Design and Preconstruction Phase
Trade permits and all City permit requirements are the responsibility of the contractor/subcontractors.
Phase 2 - Construction Phase
The contractor will implement the approved designs, providing all labor, equipment, materials, supervision, and other services that are necessary to complete the scope of work. The major improvement tasks for this project includes by not limited to:
[...] Submittals and all work shall be approved by CDD before construction.
Submission
All proposals must be submitted through the **Bonfire/EUNA Procurement Supplier Portal** at detroit.bonfirehub.com. Faxed or mailed proposals will not be accepted.
Minimum qualifications
Proposals will only be accepted from those firms demonstrating a minimum of 3 years of experience providing the services requested in the RFP for projects of similar scope and size.
Evaluation
Technical Proposals will be evaluated before Cost Proposals are reviewed.
| Proposal Evaluation Criteria | Possible Points |
| --- | --- |
| Relevant Experience | 30 |
| Capacity (Key staff, resumes, org chart, equipment) | 10 |
| Strength of Proposal | 30 |
| Past Performance | 20 |
| Pricing | 10 |
| Total Points Possible | 100 |
Bonds
The successful respondent(s) must furnish a payment and performance bond in the amount of **100% of the contract value** specified in the contract guaranteeing the contract will be accepted if tendered an award.
Contract term
The term of the contract will be for 2 years. Any renewal option exercised under this contract is effective only after the approval of the Detroit City Council and signed by the Chief Procurement Officer. The City anticipates one or multiple awards as a result of the RFP.
Subscribe to get these 13 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.