Replacement of Air Compressors at Russel Ferry

Active 550671 RFPConstruction - BuildingCity of Detroit
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Detroit (Michigan) posted this RFP on Nov 25, 2026. Responses are due Dec 22, 2026. Category: Construction - Building. Questions are due 2026-12-18. Solicitation number 550671.

Solicitation details

General information

Solicitation number
550671
Notice type
RFP
Place of performance
Michigan
Questions due
2026-12-18

Agency and category

Agency
City of Detroit
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Detroit Office of Contracting and Procurement (OCP) on behalf of Constructing and Demolition department requests proposals from qualified Respondents to render certain technical or professional services ("Services") as set forth in this RFP to provide installation and full replacement of the compressed air system at Russell Gerry Garage located at 5800 Russell Street, Detroit, MI 48211.

The Russell Ferry Garages facility supports the City of Detroit's vehicle maintenance and fleet service operations under the General Services Department. The building houses garage bays and service areas that rely on a centralized compressed air system to support daily maintenance work.

Currently, the air compressor at Russell Ferry is only producing 100 ft-lbs. of torque, compared to the required 500 ft-lbs. This reduced capacity is slowing Fleet Services operations, as staff are forced to perform tasks manually. Replacing the air compressor would improve operational efficiency and significantly reduce the risk of injury. The air compressor is critical for operating tools, installing tires, and performing cleaning tasks.

Scope

The selected contractor (Awardee) will be responsible for all aspects of this project as defined in the Scope of Work. The selected awardee will be required to manage the existing air compressor assessment, engineering, and execution of required works to achieve project goals. [...] Tasks for this project will be divided into two phases (I) Design and Preconstruction Phase; and (II) Construction phase.

Phase 1 - Design and Preconstruction Phase

  • The Contractor to complete a visual inspection and a walk-thru to assess the site and prepare complete report for the status of the existing premises and services.
  • Provide a written technical report supported with photos along with risk assessment to the existing conditions and recommendation on the priority of works that need to be completed to support achieving the project goals.
  • Conduct field investigation and review existing mechanical infrastructure as needed.
  • Based on approved directions, prepare a complete set of construction documents that are required to obtain permits and to develop a Package for construction.

Trade permits and all City permit requirements are the responsibility of the contractor/subcontractors.

Phase 2 - Construction Phase

The contractor will implement the approved designs, providing all labor, equipment, materials, supervision, and other services that are necessary to complete the scope of work. The major improvement tasks for this project includes by not limited to:

  • Selective demo for existing duct work and air system piping (to remove existing equipment)
  • Replacing and installing new compressors and refrigerated air dryer
  • Install new air distribution system including the necessary fittings and piping
  • Install new hose reel stations, FRL assemblies, and pressure gauges
  • Disposal if existing system
  • Remove and reconnect electrical services to support the air compressor installation
  • Remove and reconnect plumbing to support the air compressor installation
  • Compressor lead/lag configuration, dryer coordination, leak testing, system pressure adjustments, and full operational check
  • Startup, testing, and operator training for City personnel.

[...] Submittals and all work shall be approved by CDD before construction.

Additional information

Submission

All proposals must be submitted through the **Bonfire/EUNA Procurement Supplier Portal** at detroit.bonfirehub.com. Faxed or mailed proposals will not be accepted.

Minimum qualifications

Proposals will only be accepted from those firms demonstrating a minimum of 3 years of experience providing the services requested in the RFP for projects of similar scope and size.

Evaluation

Technical Proposals will be evaluated before Cost Proposals are reviewed.

| Proposal Evaluation Criteria | Possible Points |
| --- | --- |
| Relevant Experience | 30 |
| Capacity (Key staff, resumes, org chart, equipment) | 10 |
| Strength of Proposal | 30 |
| Past Performance | 20 |
| Pricing | 10 |
| Total Points Possible | 100 |

Bonds

The successful respondent(s) must furnish a payment and performance bond in the amount of **100% of the contract value** specified in the contract guaranteeing the contract will be accepted if tendered an award.

Contract term

The term of the contract will be for 2 years. Any renewal option exercised under this contract is effective only after the approval of the Detroit City Council and signed by the Chief Procurement Officer. The City anticipates one or multiple awards as a result of the RFP.

Documents

13 files

Subscribe to get these 13 documents.

  • AI Factsheet.pdf
    Download
  • Attachment A - Respondent Questionnaire (RFP).pdf
    Download
  • Attachment A1 Leadership Team (7).pdf
    Download
  • Attachment B - Respondent Proposal Introduction and Solution Approach.docx
    Download
  • Attachment B1 Organizational Chart (6).pdf
    Download
  • Attachment B2 Staff Roster (6).xlsx
    Download
  • Attachment C Experience References (6).xlsx
    Download
  • Attachment D Committed Work Capacity (7).xlsx
    Download
  • Attachment E Price Proposal (1).xlsx
    Download
  • Attachment F-1 - Performance Bond.pdf
    Download
  • Attachment F-2 - Payment Bond.pdf
    Download
  • RFP 550671 Replacement of Compressors at Russell Ferry Garage.pdf
    Download
  • TEMPLATE Priority Hiring Letter 2026.docx
    Download

Similar open bids

In Michigan

More from City of Detroit

Open bids