RFQ MSP Terminal 1 EMC BP#1 Enabling Work

Active Solicitation225 RFQuConstruction - Heavy & CivilMetropolitan Airports Commission
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Metropolitan Airports Commission (Minnesota) posted this RFQu on Nov 23, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Solicitation number Solicitation225.

Solicitation details

General information

Solicitation number
Solicitation225
Notice type
RFQu
Place of performance
Minnesota

Agency and category

Agency
Metropolitan Airports Commission
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This upcoming Bid Package #1 – Enabling scope consists of Civil Airside Enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center (EMC), and C Concourse expansion. This phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C12 while maintaining airport operations and limiting closures to no more than three gates at a time.

Scope

Work includes relocating the aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining the existing backup fuel supply until the new system is operational; relocation of electrical duct, cable, and fiber; new storm sewer piping, cleaning, and sealing; relocation of water service; removing and replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete aircraft apron pavement, including temporary pavement needed to support construction phasing; and restoring aircraft parking and ground-support-equipment pavement markings; and replacement of the new Passenger Boarding Bridge at C12 with foundations and MEP services.

The work will preserve uninterrupted utility service to active gates, with required service interruptions occurring at night, and will maintain the existing aircraft parking and passenger boarding bridge configuration until subsequent EMC and C Concourse construction reconfigures the gates.

**Scopes of Work** JE Dunn will be prequalifying for the following Scopes of Work:

1. Scope of Work 03 - Cast-in-Place Concrete
2. Scope of Work 24 - Aircraft Fueling System
3. Scope of Work 26 - Electrical
4. Scope of Work 27 - Low Voltage
5. Scope of Work 31 - Earthwork & Site Utilities
6. Scope of Work 32 - Site Concrete Paving
7. Scope of Work 34 - Passenger Boarding Bridges

Additional information

How to submit

  • To be qualified to perform the Work described in the Bidding Documents, the Bidder must submit and/or update the necessary information on Construction Manager's online Subcontractor Management System located at TradeTapp by BuildingConnected (BC) https://jedunn.com/trade-partners/ .
  • Upon Completing item #1, Notify JE Dunn Construction at Jim.Westlund@jedunn.com, a request a copy of the Bid Package #1 – Enabling Work "Request for Qualifications" package to be filled out by the Trade Partner and submitted to JE Dunn by the due date.
  • Due Date: **December 15, 2026 at 1:00 pm CST**.

Bidding documents are not available at this time, they will be forthcoming and issued by JE Dunn Construction to prequalified bidders during the Bidding Period.

Project highlights

  • **Prevailing wages are required** on this Project.
  • This project will contain a project labor agreement. All labor performed on site will be the requirement of the Project Labor Agreement.
  • Goals are required on this Project and are the following percentage 3-5%. Final Goal to be providing in the bidding documents.
  • Bids could be selected based upon the combination of qualifications, price, and Small Business participation.
  • Portions of this Project may be exempt from state sales and use tax. More information to be provided in the future bidding documents.

Documents

1 file

Subscribe to get this document.

  • 001115 - MSP EMC BP1 - RFQ Invitation 11.23.26.pdf
    Download

Similar open bids

In Minnesota

More from Metropolitan Airports Commission

Open bids