Metropolitan Airports Commission (Minnesota) posted this RFQu on Nov 23, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Solicitation number Solicitation225.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This upcoming Bid Package #1 – Enabling scope consists of Civil Airside Enabling work supporting the Terminal 1 Boiler & Chiller Plant Replacement, Energy Management Center (EMC), and C Concourse expansion. This phased relocation and replacement of existing utilities beneath the aircraft parking apron at Gates C6-C12 while maintaining airport operations and limiting closures to no more than three gates at a time.
Work includes relocating the aircraft fueling systems, jet fuel piping, hydrant pits, and isolation valve pits; removing and replacing two 12,000-gallon underground fuel storage tanks while maintaining the existing backup fuel supply until the new system is operational; relocation of electrical duct, cable, and fiber; new storm sewer piping, cleaning, and sealing; relocation of water service; removing and replacing portions of approximately 25,000 square yards of 12-inch and 18-inch concrete aircraft apron pavement, including temporary pavement needed to support construction phasing; and restoring aircraft parking and ground-support-equipment pavement markings; and replacement of the new Passenger Boarding Bridge at C12 with foundations and MEP services.
The work will preserve uninterrupted utility service to active gates, with required service interruptions occurring at night, and will maintain the existing aircraft parking and passenger boarding bridge configuration until subsequent EMC and C Concourse construction reconfigures the gates.
**Scopes of Work** JE Dunn will be prequalifying for the following Scopes of Work:
1. Scope of Work 03 - Cast-in-Place Concrete
2. Scope of Work 24 - Aircraft Fueling System
3. Scope of Work 26 - Electrical
4. Scope of Work 27 - Low Voltage
5. Scope of Work 31 - Earthwork & Site Utilities
6. Scope of Work 32 - Site Concrete Paving
7. Scope of Work 34 - Passenger Boarding Bridges
How to submit
Bidding documents are not available at this time, they will be forthcoming and issued by JE Dunn Construction to prequalified bidders during the Bidding Period.
Project highlights
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.