City of Omaha (Nebraska) posted this RFQ on Nov 10, 2026. Responses are due Nov 17, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-13 14:00. Solicitation number CI-2026-0161.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Fontenelle Blvd and Bedford Ave SWC Pole Replacement. The City of Omaha Public Works Department, Traffic Engineering Division, is requesting quotes for traffic signalization works, including installation of a mast arm signal pole, traffic signals, pedestrian signals, pedestrian pushbutton, conduit, cable, street name signs and a radar vehicle detection device, and relocation of an existing traffic signal.
The City of Omaha, Standard Specifications for Public Works Construction, 2026 Edition shall apply to all signal construction work completed as part of this project.
Bid items
The existing traffic signals shall remain in operation during this project unless temporary signals are turned on. Any signal downtime shall not occur during peak hours. The peak hours are Monday - Friday, 6:00 A.M to 9:00 A.M and 3:00 P.M to 7:00 P.M. Signal down time shall not occur on the weekends (Saturday & Sunday) between 9:00 A.M to 4:00 P.M.
A licensed electrician or lineman must perform all splicing and cabinet wiring or must be on site directly supervising wire splicing, signal head wiring and cabinet wiring.
The Contractor shall submit "As-Built" drawings 48 hours in advance of a signal turn-on at each intersection. Final payment for traffic signal construction shall not be made until all of the As-Built drawings, including interconnect, have been submitted and approved by the Engineer.
Bidders shall use the electronic bid system for submitting bids and must complete all required fields. Bids received after the time and date established for receiving bids will be rejected.
**Required** response attachments: *Employee Classification Act, Fair Labor, & Affidavit*, *Responsible Contractor Compliance Form (RC-1)*, Certificate of Insurance and *Certificate of Compliance*.
A Performance Bond will be required upon award of contract as outlined in the bid documents.
No bid shall be modified or withdrawn for a period of ninety (90) calendar days after the time and date established for receiving bids. In case of a discrepancy between the unit prices and their extensions, the unit prices shall govern.
Bidders must provide the number of calendar days following award that the project will be completed.