Fontenelle Blvd and Bedford Ave SWC Pole Replacement

Active CI-2026-0161 RFQConstruction - Heavy & CivilCity of Omaha
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Omaha (Nebraska) posted this RFQ on Nov 10, 2026. Responses are due Nov 17, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-13 14:00. Solicitation number CI-2026-0161.

Solicitation details

General information

Solicitation number
CI-2026-0161
Notice type
RFQ
Place of performance
Nebraska
Questions due
2026-11-13 14:00

Agency and category

Agency
City of Omaha
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Fontenelle Blvd and Bedford Ave SWC Pole Replacement. The City of Omaha Public Works Department, Traffic Engineering Division, is requesting quotes for traffic signalization works, including installation of a mast arm signal pole, traffic signals, pedestrian signals, pedestrian pushbutton, conduit, cable, street name signs and a radar vehicle detection device, and relocation of an existing traffic signal.

Scope

The City of Omaha, Standard Specifications for Public Works Construction, 2026 Edition shall apply to all signal construction work completed as part of this project.

Bid items

  • Mobilization, permits, bonds and insurance
  • Furnish and maintain temporary traffic control
  • Install pull box, type PB-6
  • Install mast arm signal pole, type MP-45
  • Install traffic signal, type TS-1A (2 EA)
  • Install traffic signal, type TS-1 (3 EA)
  • Install pedestrian signal, type PS-1 (2 EA)
  • Install pedestrian pushbutton, type PPB (1 EA)
  • Furnish and install 2" conduit (PVC or HDPE) (25 LF)
  • Furnish and install 16/C #14 AWG traffic signal cable (218 LF)
  • Furnish and install 2/C #16 PPB lead-in cable (168 LF)
  • Furnish and install street name sign (2 EA)
  • Install radar vehicle detection device (1 EA)
  • Remove sidewalk (60 SF)
  • Construct 6" PCC sidewalk (40 SF)
  • Construct 6" imprinted PCC surface (20 SF)
  • Modify existing infrastructure (pull box) (1 EA)
  • Remove and relocate traffic signal, type TS-1 (1 EA)

The existing traffic signals shall remain in operation during this project unless temporary signals are turned on. Any signal downtime shall not occur during peak hours. The peak hours are Monday - Friday, 6:00 A.M to 9:00 A.M and 3:00 P.M to 7:00 P.M. Signal down time shall not occur on the weekends (Saturday & Sunday) between 9:00 A.M to 4:00 P.M.

A licensed electrician or lineman must perform all splicing and cabinet wiring or must be on site directly supervising wire splicing, signal head wiring and cabinet wiring.

The Contractor shall submit "As-Built" drawings 48 hours in advance of a signal turn-on at each intersection. Final payment for traffic signal construction shall not be made until all of the As-Built drawings, including interconnect, have been submitted and approved by the Engineer.

Additional information

Bidders shall use the electronic bid system for submitting bids and must complete all required fields. Bids received after the time and date established for receiving bids will be rejected.

**Required** response attachments: *Employee Classification Act, Fair Labor, & Affidavit*, *Responsible Contractor Compliance Form (RC-1)*, Certificate of Insurance and *Certificate of Compliance*.

A Performance Bond will be required upon award of contract as outlined in the bid documents.

No bid shall be modified or withdrawn for a period of ninety (90) calendar days after the time and date established for receiving bids. In case of a discrepancy between the unit prices and their extensions, the unit prices shall govern.

Bidders must provide the number of calendar days following award that the project will be completed.

Documents

10 files

Subscribe to get these 10 documents.

  • Certificate of Compliance (ADA).docx
    Download
  • Bid Invitation.pdf
    Download
  • SEB Participation Utilization Form.pdf
    Download
  • Specifications_Fontenelle Blvd & Bedford Ave.docx
    Download
  • Responsible Contractor Compliance Form (ADA).docx
    Download
  • Plans_Fontenelle Blvd & Bedford.pdf
    Download
  • Instructions to Bidders (City
    Download
  • Rev 03 20 2025) ADA.docx
    Download
  • T&C (Service PB) ADA.docx
    Download
  • Affidavit for Emp Class Act (ADA) 02 18 2025.docx
    Download

Similar open bids

In Nebraska

More from City of Omaha

Open bids