CSN Collegewide E-Access

Active IFB-27-0940 IFBConstruction - BuildingCollege of Southern Nevada
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

College of Southern Nevada (Nevada) posted this IFB on Nov 14, 2026. Responses are due Dec 15, 2026. Category: Construction - Building. Solicitation number IFB-27-0940.

Solicitation details

General information

Solicitation number
IFB-27-0940
Notice type
IFB
Place of performance
Nevada

Agency and category

Agency
College of Southern Nevada
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

Scope

All conduit and wiring from removed devices shall be removed back to source.

Conduit in inaccessible locations shall be capped off and to remain in place.

Wiring shall not be abandoned in inaccessible conduits.

Exterior and interior door card reader to be HID Signo 40 series.

Card reader locations noted as existing to remain shall be migrated to the Genetec Security Center software by CSN.

Awarded contractor is responsible to field verify existing raceway and existing wire to each door within scope. Utilize existing raceway and wiring where present and extend to access control device. Terminate, label and test all access control wiring to provide a fully functional system.

Awarded contractor to provide new raceway and cabling to existing doors without existing access control raceway and cabling. Terminate, label and test all access control wiring to provide a functional system.

Awarded contractor is to coordinate with owner's representative for preferred system requirements.

Provide Securitron door position switch (DPS-W) and integrate into new door controller. Provide Assa Abloy Accentra series electric strike. Integrate new door controller to allow for remote locking in case of emergency.

Additional information

The contractor shall visit the job site to verify existing conditions prior to submitting bid (where applicable).

Where shut-downs of existing facility power systems are required, the contractor shall submit a request in writing to the architect and engineer a minimum of 5 working days in advance.

Documents

15 files

Subscribe to get these 15 documents.

  • BID ATTACHMENT 12 SCHEDULE OF VALUES.pdf
    Download
  • BID ATTACHMENT 5 SAMPLE INSURANCE.pdf
    Download
  • BID ATTACHMENT 13 BID SUBMITTAL CHECKLIST.pdf
    Download
  • BID ATTACHMENT 10 1 % LIST.pdf
    Download
  • BID ATTACHMENT 4A - GROUP 1 PLANS AND SPECIFICATIONS.pdf
    Download
  • BID ATTACHMENT 9 5% LIST.pdf
    Download
  • BID ATTACHMENT 11 AFFIDAVIT.pdf
    Download
  • BID ATTACHMENT 4C - GROUP 3 PLANS AND SPECIFICATIONS.pdf
    Download
  • BID ATTACHMENT 1 - BID DOCUMENT.pdf
    Download
  • BID ATTACHMENT 2 - DRAFT CONTRACT.pdf
    Download
  • BID ATTACHMENT 7 CHANGE ORDER FORM.pdf
    Download
  • BID ATTACHMENT 8 LIST OF TIER 2 SUPPLIERS.pdf
    Download
  • BID ATTACHMENT 6 PAYMENT AND PERFORMANCE BOND.pdf
    Download
  • BID ATTACHMENT 3 - SCOPE OF WORK.pdf
    Download
  • BID ATTACHMENT 4B - GROUP 2 PLANS AND SPECIFICATIONS.pdf
    Download

Similar open bids

In Nevada